Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 10, 2025 at 8:00 PM
Updated September 11, 2025
Site work for a water / sewer project in Cape Charles, Virginia. Completed plans call for site work for a water / sewer project.
Second Phase of Reconstruction of the Harbor Boardwalk. the Work Entails Demolition and Reconstruction of Approximately 4,560 Square Feet of Boardwalk in the Base Bid For clarification or interpretation of this IFB contact Mr. Bob Panek in the Town Manager's office, 757-331-3259 ext. 19. The work entails demolition and reconstruction of approximately 4,560 square feet of boardwalk in the base bid. Several bid alternates are included. Scope of Work Base Bid Reconstruct harbor boardwalk 380 feet long and 12 feet wide as follows: _ Demolish and properly dispose of existing wood decking and existing 4"x6" stringer (joist) at outside edge on north side of boardwalk. _ Demolish and properly dispose of 10 existing wood benches, 7' long, along the boardwalk, including electrical components (light fixtures, PVC conduit, wiring). _ Demolish and properly dispose of existing deteriorated 2"x12" wood battens (beams) between the stringers and concrete bulkhead cap. Assume 30 of the approximately 60 battens will need to be demolished and replaced. _ New boardwalk shall be nominal 1"x6" composite decking over wood stringers, 16" on center. Stringers shall be 4"x6" on the north outside edge and 4"x4" between edges. Existing stringers are 24" on center, so only 6 new 4"x4" stringers should be needed. Retain the existing 4"x6" stringer on the south outside edge. New battens shall be 2"x12". Bid Alternate 1 Price deduction for 105 linear feet less, for a total of 275 linear feet. Bid Alternate 2 Demolish, properly dispose of decking and joists for 4 crosswalks, 8 feet long and 4 feet wide, and rebuild per above. Bid Alternate 3 Unit price to demolish, properly dispose of and replace additional 12 foot long, 2"x12" battens if needed. Bid Alternate 4 Linear foot unit price to demolish, properly dispose of and replace additional 4"x4" stringers if needed, Specifications All wood shall be pressure treated suitable for ground contact, UC4B category. Decking shall be Wolf Perspective, Potomac Grey color to match existing rebuilt section. All fasteners shall be per component manufacturer's specifications and shall be SAE 316 stainless steel. Any material substitutions shall be approved in advance
Award
Water / Sewer
$113,530.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 20, 2025
October 15, 2025
To Be Determined, Cape Charles, VA
Related To This Project
Cape Charles, VA
--
Cape Charles, VA
Bid Date: Sep 12 2025
Cape Charles, VA
Bid Date: Oct 22 2025
Cape Charles, VA
Bid Date: Nov 26 2025
Cape Charles, VA
--
Cape Charles, VA
--
Cape Charles, VA
Bid Date: Jul 29 2025
Cape Charles, VA
Bid Date: Jun 26 2025
Cape Charles, VA
Bid Date: Apr 16 2025
Cape Charles, VA
Bid Date: Apr 07 2025
Cape Charles, VA
Bid Date: Apr 04 2025
Cape Charles, VA
Bid Date: Feb 28 2025
Cape Charles, VA
Bid Date: Mar 26 2025
Cape Charles, VA
Bid Date: Feb 18 2025
Cape Charles, VA
Bid Date: Feb 17 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
