Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 22, 2025 at 8:00 PM
Updated August 23, 2025
This is a service / maintenance or supply contract in Charleston, South Carolina. Contact the soliciting agency for additional information.
The contract covers the provision of chemical water treatment services for various HVAC systems, including TRANE chillers and EVASCO cooling towers, as well as closed-loop systems such as hot water and glycol loops. The contractor is responsible for delivering and storing chemicals in coordination with the Boiler/Chiller Plant Manager, following guidelines outlined in the PWS, particularly items 9 and 10. Monthly on-site service is expected for all systems, with seasonal startup and shutdown support required as needed, in accordance with manufacturer instructions and best practices. The contractor must also manage a corrosion coupon program, including providing coupons and holders, and conducting full analysis and reporting. Digital service reports are to be submitted via email or PDF, unless otherwise advised. Emergency support must be available within 24 to 48 hours for water quality or biological issues, with the contractor located within 100 miles of the site to ensure reasonable response times. Evaluation criteria and pricing structure, including whether to separate labor and materials or bundle them, are to be confirmed with the Contracting Officer. No estimate of annual service frequency or chemical usage volume is available. Questions Answered for RFI: 36C24725Q0843 Water Treatment and Water Chemistry Services for Cooling Towers and Chillers Base plus 4 Year 1. Are the Steam Boilers included No 2. Do you know if you are feeding a Nitrite in the chiller loops I do not think so but I m unsure. 3. Do you feed the secondary chillers separate or are they on the same loop Not to my knowledge. 4. I noticed that you are feeding a dry chemical for your towers, are you opposed to feeding a liquid chemical instead No dry chemicals are fed into the towers. It is mixed at the mixing station upstairs by the bathroom. PLEASE SUBMIT CAPABILITY STATEMENTS/QUOTES BY 1:00PM CST, FRIDAY, AUGUST 8, 2025. *****See attached Cooling Tower water testing results
Final Planning
Medical
Public - Federal
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2025
109 Bee St, Charleston, SC
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
