BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Site work and paving for a bridge / tunnel in Fall Creek, Wisconsin. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Solicitation Id: SE-01 The structure needs treatment to extend its service life. Rehabilitation project to rehabilitate the bridge along 3 miles of IH 794 (Hoan Bridge and Lake Freeway) from the Milwaukee River to Car Ferry Dr in the city of Milwaukee in Milwaukee County. Primary work includes repair of shiplap joints, girder painting, sign bridge repairs, and drainage repair. Additional improvements include new pavement markings and signage. Anticipated Construction Cost: $15,000,000-$16,999,999 DBE Goal: DBE Goal in $ 0.00 Anticipated Project Start Date: 12/01/2025 Anticipated Project Completion Date: 03/01/2028 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Rehabilitation - Bridge Rehabilitation *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Bridges / Tunnels

$16,999,999.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
26
Bidding Soon
452
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2025

Project location map

US-12, Fall Creek, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.