BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 18, 2026 at 7:00 PM

Updated February 19, 2026

Site work and paving for a road / highway in Fall Creek, Wisconsin. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Limit Prill Road Intersection To add a westbound left-turn lane, to expand to the south for construction of a left-turn lane, and to install an eastbound right-turn lane to preserve the function, operation, and safety of this route in the overall transportation system. Modernization HSIP improvement project on USH 12 in the Town of Washington in Eau Clarie County to install a westbound left-turn lane and an eastbound rightturn lane to improve safety. The left-turn lane will help reduce westbound rear end crashes. Required widening will be acquired from the south side of USH 12. Net centerline miles 0.005. Anticipated Construction Cost: $750,000-$999,999 The Method of Contractor Selection Has Not Been Determined at This Time. WisDOT - RFP Engineering - T Washington, Prill Road *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

$999,999.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
61
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2026

Project location map

US-12, Fall Creek, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.