BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 4, 2025 at 8:00 PM

Updated October 5, 2025

Site work, paving and outdoor lighting for a civil project in Harrisburg, Pennsylvania. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; for outdoor lighting for a road / highway; and water / sewer project.

This Project is for the Replacement of the Township Road Bridge Over West Branch of Big Elk Creek and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 7015, Section 297, in Chester County, Lower Oxford Township From Approximately 200' West of the Bridge to 150' East of the Bridge. Project Cost Range: $125,000,000.00 - $149,999,999.99 Federal Project Status: Federal Oversight Structure Work: 38.00% Pre-Bid Meeting: None Anticipated NTP: 10/27/2025 Wage Rates: Yes Required Completion: 10/18/2033 Prequalification Requirement: Yes State Type of Work: Highway Reconstruction Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an addendum. The deadline for submitting questions is 72 hours before the let date and time. For emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - I-83 East Shore Section 3B *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The project consists of the widening and reconstruction of an existing 24-foot roadway, consisting of new Superpave pavement 36 feet in width and full depth paved shoulders, 24-foot collector distributor roadways, accel/decel lanes, ramps and sideroads, upgrade to the 17th Street partial interchange. Roadway and structure improvements are included on 13th Street (SR 3011) including replacement of a three-span bridge with a two-span bridge, and 17th Street including replacement of two single- span bridges with two single-span bridges, and at Paxton Street including replacement of a multi-span bridge with a single-span bridge. Also included are: embankment benching and sliver fills, two proposed retaining walls, one proposed moment slab with toe wall, six proposed overhead sign structures, guiderail, drainage, pollinator garden, highway lighting, pavement markings, and other miscellaneous construction, all contained within an overall project length of 10,210 linear feet (1.934 miles) as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0083, SECTION B79, in DAUPHIN COUNTY, CITY OF HARRISBURG, SWATARA TOWNSHIP, from a point approximately 1,000 feet west of the Cameron Street underpass at Segment 0424/0425 Offset 0724/0724 to the 29th Street overpass at Segment 0444/0445 Offset 1432/1406.

Award

Roads / Highways

$132,727,725.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

1714

13

114

7

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
442
Active Projects
228
Bidding Soon
2,034
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2025

October 27, 2025

Project location map

Multiple Locations, Harrisburg, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.