BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2025 at 7:00 PM

Updated November 13, 2025

Site work for a water / sewer project in Thunderbolt, Georgia. Completed plans call for site work for a water / sewer project.

The installation of a new altitude valve and check valve in a precast vault as well as the installation of a small jacuzzi pump at the existing Russell Street elevated storage tank. Work includes all electrical and all necessary piping, valves, and fittings associated with the construction of the altitude valve, check valve, and jacuzzi pump as shown on the plans and in the specifications. Last day for Questions to submit in writing shall be Friday, September 19th, 2025, at 5:00 PM.

Award

Water / Sewer

$448,053.00

Public - City

Site Work

8

18

4

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
80
Bidding Soon
774
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2025

October 29, 2025

Project location map

Russell St, Thunderbolt, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.