BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 5, 2025 at 8:00 PM

Updated August 6, 2025

Demolition and site work for a residential development in Red Bank, New Jersey. Working plans call for the demolition of a residential development; and for site work for a residential development.

As per the Owner the project has been cancelled. This project will be rebid on a later date that has not yet been determined. The proposed work consists of: the demolition of the building When applicable, any response to the invitation to bid shall use unit concrete products that utilize carbon footprint-reducing technology whenever technically feasible. All bidders shall be required to comply with N.J.S.A. 10:5-31, et seq. and N.J.A.C.17: 27, requiring each bidder and each subcontractor to formulate and submit to the proper authorized representative of the State of New Jersey an affirmative action program of equal opportunity, which guarantees minorities employment in all categories. If a bidder is a corporation, Subchapter S corporation, partnership, limited partnership, or limited liability partner or company the bidder, in conformance with N.J.S.A. 52:25-24.2 et seq., shall submit with its bid a statement setting forth the names and addresses of all stockholders who own a ten percent (10%) or greater interest in the firm. All bidders are advised of the penalties for false, deceptive, or fraudulent statements as required by N.J.S.A. 40A:11-33 through -34. The Project shall conform to the Local Public Contract Law, N.J.S.A. 40A:11-1 et. seq. The Township reserves the right to reject bids in accordance with N.J.S.A. Question Submission Deadline August 1, 2025, 4:00pm Demolition of a two-story split-level residential dwelling with attached garage located at 127 Hubbard Avenue, Block 1030 Lots 7 & 10, in the River Plaza Section of Middletown Township Contractor to obtain all demolition permits from the Township Building Department and utility companies, disconnect all utilities per Township and utility company specifications, remove all hazardous materials from structures, demolish structures, remove and dispose of all materials, contents and debris per Township requirements (including recycling of certain materials), fill all excavated areas with certified clean fill material (fully compacted in 12-inch lifts), properly grade the lot to generally match existing slopes so no drainage issues are created. Topsoil, seed & mulch the entire disturbed area of the lot. Project has been cancelled.

Final Planning

Residential Subdivision

$400,000.00

Public - City

Demolition, Site Work

3

4

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
876
Active Projects
343
Bidding Soon
7,247
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2025

September 15, 2025

Project location map

127 Hubbard Ave, Red Bank, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.