Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 8, 2025 at 8:00 PM

Updated August 9, 2025

Site work for a water / sewer project in Pomeroy, Washington. Completed plans call for site work for a water / sewer project.

Irrigation Pump Repairs in accordance with the attached solicitation documents. The resulting purchase order will be a firm-fixed price type and have a period of performance of 60 days. The services will take place at the Central Ferry Research Farm, 639 Hastings Hill Rd., Pomeroy, WA 99347. The final day for question submission is 3:00 pm Pacific Time on Monday August 4, 2025. Questions must be submitted electronically, e-mailed to frank.palmer@usda.gov. Following extensive diagnostics prompted by significant pump station vibration, it has been determined that the pump shaft bushing has deteriorated after 56 years of operation. The well, rated at 1,800 gallons per minute, serves as the primary irrigation source for a 100-acre research farm supporting Pullman Germplasm and low-elevation seed grow-out trials. Without this system, plant propagation will cease, jeopardizing critical breeding, preservation, and research initiatives--including native species development and medicinal plant exploration. Immediate need for this repair is crucial. III. Description of Work: 1. Pre-Removal Operations: a. Disconnect and safely secure the Wi-Fi antenna. b. Remove the overhead shade structure. 2. Pump Disassembly and Removal: a. Disconnect all electrical components. b. Remove the 150 HP vertical turbine motor. c. Extract and remove the existing 65-foot pump shaft assembly. 3. Component Replacement and Reinstallation: a. Install a new pump shaft assembly and ground pedestal. b. Reinstall the pump motor and complete electrical connections. c. Set the proper operational gap in the bowl assembly to ensure peak hydraulic efficiency. d. Reinstall the oiler system to ensure proper bushing lubrication. 4. Finalization: a. Reinstall the overhead shade. b. Reconnect the Wi-Fi antenna and verify communication functionality.

Post-Bid

Water / Sewer

$200,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
7
Bidding Soon
297
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

September 1, 2025

Project location map

639 Hastings Hill Rd, Pomeroy, WA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed