BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 29, 2025 at 8:00 PM

Updated November 18, 2025

Site work and paving for a mixed-use development in Pomeroy, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Work Includes, but is Not Limited to, Guardrail Removal/replacement, Slope Flattening, Soft Spot Repair, and Roadway Resurfacing. Roadway Resurfacing Will Include Cement Treated Base (Ctb), and Bituminous Surface Treatment (Bst) on Approximately 1.68 Miles of Road, All in Accordance With the Plans, Special Provisions, and the Washington State Department of Transportation 2 025 Standard Specifications. This Project is Being Funded Through Wsdot Federal Aid No. Hsip-t120(003). Contractor Will Be Subject to All Federal and State Requirements Relating to the Use of Such Funds. Attention of Bidders is Particularly Called to the Requirement as to the Condition of Employment to Be Observed and Minimum Wage Rates to Be Paid Under the Contract. The Owner Reserves the Right to Waive Any Informalities, Minor Defects, or to Reject Any or All Bids. Each Bidder Must Deposit With Their Bid, Security in the Amount of Five Percent (5%) of the Total Bid Amount, Subject to the Conditions Provided for in the Bid Procedures and Conditions. No Bidder May Withdraw His Bid Within Thirty (30) Days After the Actual Date of the Opening Thereof. The Following is Applicable to Federal Aid Projects. Garfield County, in Accordance With Title Vi of the Civil Rights Act of 1964, (78 Stat. 252, 42 U.s.c. 2000d to 2000d-4) and the Regulations, Hereby Notifies All Bidders That It Will Affirmatively Ensure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full and Fair Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, or National Origin in Consideration for an Award. Bids Must Be Completed on a Lump Sum and Unit Price Basis as Indicated on the Bid Proposal, and the Total as Defined in the Special Provisions Will Be Used for the Purpose of Comparison of Bids for the Lower Deadman Mp 10.23 - 11.91 Project. Award of the Construction Contract Will Be to the Lowest Responsible Bidder. All Questions Must Be in Writing and May Be Directed to the Project Engineer at Hmh Engineering, Hholley@hmh-llc.com, and the County Engineer at Garfeng@garfieldcountywa.gov. No Questions Will Be Accepted After November 10, 2025.

Post-Bid

Sidewalks / Parking Lot

$2,326,500.00

Public - County

Paving, Site Work

53

4

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
5
Bidding Soon
248
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2025

January 16, 2026

Project location map

Lower Deadman Rd, Pomeroy, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.