Published August 20, 2025 at 8:00 PM

Updated August 21, 2025

Site work for a water / sewer project in Roseburg, Oregon. Completed plans call for site work for a water / sewer project.

Bids shall be accompanied by a certified check, cashier's check, irrevocable letter of credit, or bid bond in an amount equal to ten percent (10%) of the total amount of the Bid. All Bidders must submit a list of their first-tier subcontractors. This Project consists of, but is not limited to, the following: Excavation and installation of a gravity force main to convey leachate effluent from the existing leachate loadout area at the Roseburg Landfill down McLain West Ave to a termination point east of the existing sidewalk; and excavation and installation of a non-potable water line extending from the current service at 102 Chewaucan Ave to the existing pipe stub-outs adjacent to the leachate treatment plant. Bidders are not required to submit a prequalification application. The Board of Commissioners will not consider a bid unless the bidder is registered with the Construction Contractor's Board. Bidders shall comply with the provisions of ORS 279C.800 to 279C.870 (Prevailing Wage Rates). Each Bid must contain a statement as to whether the Bidder is a resident bidder, as defined in ORS 279A.120. The Project does not require a contractor or subcontractor to be licensed under ORS 468A.720 for asbestos abatement. The Board of Commissioners reserves the right to reject any or all Bids, to waive technicalities, and to award the contract to the lowest responsive responsible Bidder. The Board of Commissioners may reject any Bid not in compliance with all prescribed public contracting procedures and requirements and may reject all Bids upon a finding that it is in the public interest to do so. Trenching and construction of a gravity force main and waterline down McLain West Ave for future leachate effluent conveyance. This Project consists of, but is not limited to, the following: Excavation and installation of a gravity force main to convey leachate effluent from the existing leachate loadout area at the Roseburg Landfill down McLain West Ave to a termination point east of the existing sidewalk; and excavation and installation of a non-potable water line extending from the current service at 102 Chewaucan Ave to the existing pipe stub-outs adjacent to the leachate treatment plant. North of Interstate 5 - The 3-inch diameter force main work is to start at the tie-in point to the existing 6-inch/3-inch dual containment effluent force main and extend approximately 1,920 linear feet along Landfill Rd./McLain West Ave. to the centerline of the Interstate 5, exit 121 overpass. A 3-inch diameter potable waterline will also be extended approximately 1,800 linear feet north along Landfill Rd./McLain West Ave starting at Chewaucan Lane and terminating near the driveway to Douglas County's new leachate treatment facility. For more specific information, see the location and vicinity maps on the Plans. South of Interstate 5 - The 3-inch diameter force main work is to continue approximately 165 linear feet from the centerline of the Interstate 5, exit 121 overpass to the point of termination just south of the multi-use pedestrian path that parallels Interstate 5. For more specific information, see the location and vicinity maps on the Plans. questions and objections, pertaining to this RFB shall be directed to: Nicholas Frisinger Contract Administrator 1036 SE Douglas Avenue, CH Rm 308 Roseburg, OR 97470 Telephone Number: 541-440-6093 Fax Number: 541-440-4413 Email: Nicholas.frisinger@douglascountyor.gov James Norrington is the Project Manager and Engineer All questions and/or requests for interpretation or correction shall be in writing and addressed to the Contract Administrator no later than August 6, 2025. The following provides approximate lengths of the effluent force main line and waterline to be installed: a. Approximately 2,065 linear feet of 3-inch DR11 HDPE force main. b. Approximately 1,787 linear feet of 3-inch DR17 polyethylene waterline. The estimated construction cost for the Base Bid is between $400,000 and $532,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$446,904.00

Public - County

Site Work

15

10

2

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
9
Bidding Soon
209
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2025

September 8, 2025

Project location map

384 McLain W Ave, Roseburg, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.