Site work for a water / sewer project in Fall River, Massachusetts. Completed plans call for site work for a water / sewer project.
The work consists of furnishing all labor, material and equipment for the installation of 1.5 to-3-foot armor stone at the revetment along Northfield Point with reuse of existing stone to the extent practicable. The approximate overall length of revetment is 1,200 feet. Work also includes furnishing and installing turbidity curtain, erosion controls and restoration of areas disturbed by the work. All work shall be in accordance with project permits issued by the Fall River Conservation Commission, Massachusetts Department of Environmental Protection and the Army Corps of Engineers. All questions must be submitted in writing via email to Wiiliam McGrath, PE. BETA Group, Inc. at BMcGrath@BETA-Inc.com by 4:00 pm on August 13, 2025. Responses will be in the form of an addendum issued to all plan holders on file by 12 pm on August 18, 2025. The Fall River Redevelopment Authority intends to award a contract within thirty (30) days of bid opening. Each bid shall be accompanied by a bid deposit equal to (5%) of the total amount of the bid. The bid deposit may be in the form of treasurers' check, certified check, bid bond, or cashier's check issued by a responsible bank or trust company, payable to the Fall River Redevelopment Authority. The project area consists of the northern portion of a 5.9-acre parcel located off Davol Street and adjacent to the Senator Thomas Norton City Pier, the Taunton River and the Point Gloria Condominiums. Northfield Point has an area of approximately 1 acre and is located north of City Pier and west of the Bicentennial Park Trail. Northfield Point consists of a peninsula that is fenced off to the public with a chain link fence. Vegetation management to remove certain invasive and nuisance plants from the Northfield Point area is scheduled for August through September 2025. The work consists of furnishing all labor, material and equipment for the installation of 1.5 to-3-foot armor stone at the revetment along Northfield Point with reuse of existing stone to the extent practicable. The approximate overall length of revetment is 1,200 feet. Work also includes furnishing and installing turbidity curtain, erosion controls and restoration of areas disturbed by the work. All work shall be in accordance with project permits issued by the Fall River Conservation Commission, M assachusetts Department of Environmental Protection and the Army Corps of Engineers. The Lump Sum price paid for this item shall include full compensation for all labor, equipment, materials and incidentals needed to complete the following: a. Initiating and administering the contract, including but not limited to furnishing performance and payment bonds and all other securities and insurances required, project meetings, securing of all necessary permits, etc., for providing all other materials, supplies, tools, equipment, labor, financing, supervision, temporary structures, and any and all other administrative expenses incurred in carrying out the Work and furnishing the materials, keeping records and preparing required reports, permitting, the work, and assuming risks, which have not been included in the prices in other items of the Bid Proposal; b. Costs, exclusive of the cost of materials, for mobilizing all machinery, tools, and other equipment necessary to carry on and complete the Work. c. Costs for preparing shop drawings and submittals. d. Costs for maintaining and updating the project schedule for submission to and approval by the Owner. e. Operational costs related to the Work contained within this contract. f. Costs for demobilizing and removing equipment at the completion of the project. All invoices are to be submitted to Karen Martin at kmartin@fallriverma.gov or mailed to our office at 1 Government Center, Room 610, Fall River, MA 02722 Any questions, please reach out to our office at (508)324-2662 or email kmartin@fallriverma.gov.
Award
Water / Sewer
$447,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 21, 2025
September 18, 2025
600 Davol St, Fall River, MA
Related To This Project
Fall River, MA
Bid Date: Aug 14 2025
Fall River, MA
Bid Date: Sep 09 2025
Fall River, MA
Bid Date: Oct 02 2025
Fall River, MA
Bid Date: Sep 17 2025
Fall River, MA
Bid Date: Sep 24 2025
Fall River, MA
Bid Date: Oct 09 2025
Fall River, MA
Bid Date: Oct 30 2025
Fall River, MA
Bid Date: Jul 17 2025
Fall River, MA
Bid Date: Jul 31 2025
Fall River, MA
Bid Date: Aug 14 2025
Fall River, MA
Bid Date: Jul 03 2025
Fall River, MA
Bid Date: Jul 14 2025
Fall River, MA
Bid Date: Nov 12 2020
Fall River, MA
Bid Date: Jun 20 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.