Published August 28, 2025 at 8:00 PM

Updated August 29, 2025

Site work for a water / sewer project in Fall River, Massachusetts. Completed plans call for site work for a water / sewer project.

The work consists of furnishing all labor, material and equipment for the installation of 1.5 to-3-foot armor stone at the revetment along Northfield Point with reuse of existing stone to the extent practicable. The approximate overall length of revetment is 1,200 feet. Work also includes furnishing and installing turbidity curtain, erosion controls and restoration of areas disturbed by the work. All work shall be in accordance with project permits issued by the Fall River Conservation Commission, Massachusetts Department of Environmental Protection and the Army Corps of Engineers. All questions must be submitted in writing via email to Wiiliam McGrath, PE. BETA Group, Inc. at BMcGrath@BETA-Inc.com by 4:00 pm on August 13, 2025. Responses will be in the form of an addendum issued to all plan holders on file by 12 pm on August 18, 2025. The Fall River Redevelopment Authority intends to award a contract within thirty (30) days of bid opening. Each bid shall be accompanied by a bid deposit equal to (5%) of the total amount of the bid. The bid deposit may be in the form of treasurers' check, certified check, bid bond, or cashier's check issued by a responsible bank or trust company, payable to the Fall River Redevelopment Authority. The project area consists of the northern portion of a 5.9-acre parcel located off Davol Street and adjacent to the Senator Thomas Norton City Pier, the Taunton River and the Point Gloria Condominiums. Northfield Point has an area of approximately 1 acre and is located north of City Pier and west of the Bicentennial Park Trail. Northfield Point consists of a peninsula that is fenced off to the public with a chain link fence. Vegetation management to remove certain invasive and nuisance plants from the Northfield Point area is scheduled for August through September 2025. The work consists of furnishing all labor, material and equipment for the installation of 1.5 to-3-foot armor stone at the revetment along Northfield Point with reuse of existing stone to the extent practicable. The approximate overall length of revetment is 1,200 feet. Work also includes furnishing and installing turbidity curtain, erosion controls and restoration of areas disturbed by the work. All work shall be in accordance with project permits issued by the Fall River Conservation Commission, M assachusetts Department of Environmental Protection and the Army Corps of Engineers. The Lump Sum price paid for this item shall include full compensation for all labor, equipment, materials and incidentals needed to complete the following: a. Initiating and administering the contract, including but not limited to furnishing performance and payment bonds and all other securities and insurances required, project meetings, securing of all necessary permits, etc., for providing all other materials, supplies, tools, equipment, labor, financing, supervision, temporary structures, and any and all other administrative expenses incurred in carrying out the Work and furnishing the materials, keeping records and preparing required reports, permitting, the work, and assuming risks, which have not been included in the prices in other items of the Bid Proposal; b. Costs, exclusive of the cost of materials, for mobilizing all machinery, tools, and other equipment necessary to carry on and complete the Work. c. Costs for preparing shop drawings and submittals. d. Costs for maintaining and updating the project schedule for submission to and approval by the Owner. e. Operational costs related to the Work contained within this contract. f. Costs for demobilizing and removing equipment at the completion of the project. All invoices are to be submitted to Karen Martin at kmartin@fallriverma.gov or mailed to our office at 1 Government Center, Room 610, Fall River, MA 02722 Any questions, please reach out to our office at (508)324-2662 or email kmartin@fallriverma.gov.

Award

Water / Sewer

$447,000.00

Public - City

Site Work

35

12

10

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
515
Active Projects
252
Bidding Soon
3,470
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2025

September 18, 2025

Project location map

600 Davol St, Fall River, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.