BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2025 at 8:00 PM

Updated October 1, 2025

Site work for a detention facility in Fall River, Massachusetts. Completed plans call for site work for a detention facility.

Payment Bond: In accordance with Massachusetts procurement requirements, a 50% Payment Bond will be required for contracts exceeding $25,000. Labor, materials, required to replace the main control board and transformer in the DoorKing 9200 gate operator and to replace the damaged gate track extrusion with Ameristar AdapTrack system, including new trolleys and associated hardware at the Fall River Justice Center located at 186 South Main St., Fall River, MA 02721. DoorKing 9200 gate operator. o Disconnect and remove the existing main control board and transformer from the o Supply and install a new OEM DoorKing 9200 main control board. o Supply and install a new transformer compatible with the DoorKing 9200 system. o Perform wiring connections and configuration as per manufacturer specifications. o Test system functionality to ensure reliable operation and compliance with safety standards. B. Gate Track System Replacement o Remove the existing damaged gate track extrusion system. o Supply and install new Ameristar AdapTrack gate tracking system. o Provide and install new gate trolleys and associated mounting hardware. o Ensure all components are properly aligned and securely mounted for smooth gate travel. o Lubricate and test the new track and trolley system for full operational compliance. 3. Materials and Equipment o DoorKing 9200 Main Control Board (OEM) o Transformer (compatible with DoorKing 9200) o Ameristar AdapTrack extrusion o Gate trolleys (2 or as required) o Mounting hardware (bolts, brackets, fasteners) o Standard tools and equipment for removal and installation 4. Deliverables o Fully functional DoorKing 9200 gate operator system o New AdapTrack gate track installed with trolleys and hardware o Operational testing and final inspection o Basic user training or system walk-through, if requested 5. Schedule Work is to be completed within 30 business days from the start date, pending weather and site access. 6. Exclusions o Electrical service upgrades beyond the transformer o Gate structural repairs unrelated to the track system o Permits or inspections (unless otherwise stated) 7. Acceptance Criteria o System passes full functional and safety testing o Smooth and consistent gate operation o Final sign-off by site representative

Post-Bid

Jails / Prisons

$12,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
645
Active Projects
358
Bidding Soon
3,369
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2025

October 17, 2025

Project location map

186 S Main St, Fall River, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.