BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 13, 2025 at 8:00 PM

Updated August 14, 2025

Site work and new construction of a pre-engineered storage facility in Lebanon, Connecticut. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Project Description: Erection of Pre-Engineered Steel Building sealed proposals for the erection of a pre-engineered steel building at the Lebanon Department of Public Works (DPW) Complex. Scope of Work Highlights: Erection of pre-engineered steel building Davis Bacon Wage Scale applies; monthly wage certifications required Project is tax-exempt; building permit fees waived (permit application still required) Contractor must hold a current CT Department of Consumer Protection license Scope of Work: Building Permit fees are not applicable to this Project. Awarded Firm is still required to apply for Permit. Project is Tax Exempt and Davis Bacon Act Wage Scale is included. Bidder shall have a current License from the State of CT Dept. of Consumer Protection. Insurance Certificate (Town of Lebanon Certificate Holder) shall be submitted with Bid. a. General Liability: $1,000,000 per Occurrence b. Automobile Liability: $1,000,000 per Occurrence c. Workers Compensation: Per State Standards Town of Lebanon retains the right to award the Contract to the low, qualified and responsible firm. Town of Lebanon Ct is an Equal Opportunity Employer. This Section includes erection of Pre-Engineered Building as follows: 1. Pre-engineered metal building systems for Lebanon DPW Storage and Wash Bayas specified and indicated on the drawings including, but not limited to primary and secondary structural steel framing members, connection bolts, insulated wall and roof panels, framed and trimmed openings, gutters and downspouts, flashings, sealants, and other miscellaneous items and accessories as specified herein for a complete, weather tight, and insulated building envelope. 2. Secondary framing members consisting of purlins, girts, eave struts, flange braces and sag angles as required by the design. 3. Insulated roof and wall systems shall consist of preformed, insulated steel panels, trim, and accessories as required for a complete and weathertight installation. 4. Bracing to be cable "X" type in roof and walls, or equal. As of August 13, 2025, an award has not been announced. The announcement is expected in approximately two weeks.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$160,000.00

Public - City

New Construction, Site Work

34

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
774
Active Projects
431
Bidding Soon
5,312
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2025

September 8, 2025

Project location map

To Be Determined, Lebanon, CT


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.