Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 18, 2026 at 8:00 PM
Updated May 20, 2026
Demolition, site work, paving, new construction and renovation of a mixed-use development in West Haven, Connecticut. Working plans call for the demolition of a medical facility; for the construction of a medical facility; for site work for a medical facility; road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; sidewalk / parking lot; and for the renovation of a medical facility.
The U.S. Army Corps of Engineers, New England District is hosting an Industry Day to provide construction contractors with information regarding the Chilled Water Replacement and Site Utility Improvements (Phase A2) project. This Industry Day is a save-the-date notice intended to support market research and information sharing for a future major construction procurement. No action is required at this time. The project is part of a larger, multi-phase VA Major Construction effort associated with the Construct New Surgical and Clinical Space Tower program and is currently programmed for construction award in Fiscal Year 2027. The anticipated procurement is expected to be a Design-Bid-Build Best Value Trade-Off Request for Proposal, with an estimated construction cost between $40,000,000 and $115,000,000. Phase A2 consists of demolition and replacement of the existing chilled water plant and construction of significant site utility upgrades to improve campus infrastructure and provide new and redundant utilities to support both the existing VA Connecticut Healthcare System campus and the future Surgical and Clinical Space Tower. Work includes demolition of the existing chilled water plant (Building 16a) and construction of a new multi-story chilled water plant with chillers, cooling towers, pumps, and associated mechanical and electrical systems. Due to proximity to the existing fuel tank farm, a new fuel tank farm will also be constructed, requiring close coordination with ongoing medical center operations and related projects. The site utility scope includes replacement and upgrade of fire protection and domestic water mains from Campbell Avenue to Building 15, construction of utility main loops for chilled water supply and return, steam supply, condensate return, domestic water, and fire protection water originating from the new chilled water plant and back-feeding to Building 1. Additional work includes installation of redundant electrical feeders from the utility demarcation point to Building 19, coordination with the local electrical utility provider for offsite electrical redundancy, and construction of new water storage tanks. Location: VA Connecticut Healthcare System, West Haven Campus, 950 Campbell Avenue, West Haven, CT 06516 The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Medical
$115,000,000.00
Public - Federal
Demolition, LEED Certification, New Construction, Paving, Renovation, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 22, 2027
950 Campbell Ave, West Haven, CT
Related To This Project
West Haven, CT
Bid Date: Aug 15 2025
West Haven, CT
Bid Date: Sep 02 2025
West Haven, CT
Bid Date: Aug 15 2025
West Haven, CT
Bid Date: Aug 15 2025
West Haven, CT
--
West Haven, CT
Bid Date: Oct 10 2025
West Haven, CT
--
West Haven, CT
Bid Date: Sep 12 2025
West Haven, CT
Bid Date: Aug 01 2025
West Haven, CT
--
West Haven, CT
Bid Date: Aug 12 2025
West Haven, CT
Bid Date: Jun 13 2025
West Haven, CT
Bid Date: Jun 25 2025
West Haven, CT
Bid Date: Jun 05 2025
West Haven, CT
Bid Date: Jul 01 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
