Renovation of a fire / police facility in Ypsilanti, Michigan. Completed plans call for the renovation of a fire / police facility.

Reference Number 0000394266 The City of Ypsilanti ("City" or "Owner") was recently awarded a Michigan Department of Environment, Great Lakes, and Energy Community Energy Management Grant ("Grant") to fund the purchase and installation of one dual port Level 2 EV charger at the City's Fire Station to serve City fleet vehicles. In partial fulfillment of this Grant, the City is issuing this Invitation to Bid for experienced electricians interested in installing the dual port Level 2 EV charger. Additionally, the City's application for two DTE Charging Forward eFleet rebates was approved. Therefore, installation of the chargers must abide by the City's Grant Agreement as well as the DTE eFleets Program Terms and Conditions signed by the City. Please see project documents for additional details and requirements. Buyer Preferences, Guidelines & Requirements General Requirements - Federally Funded - Prevailing Wage Required - Warranty Information Required Award Requirements - Reserve Rights to Award by Line Item Bonding Requirements - Performance Bond 100 % - Labor and Materials Bond 100 % Question Deadline 08/19/2025 at 2:00 PM ET Questions are submitted online No, Questions may be directed to: Department of Public Works City of Ypsilanti dpw@cityofypsilanti.com The City of Ypsilanti is looking to have a dual-port AC Level 2 EV charger, outputting at least 7.2 kWh per outlet, installed at the Ypsilanti Fire Station (located at 525 West Michigan Ave, Ypsilanti, Michigan, 48197). It is believed that the best location for the EV charger, would be one of two possible locations identified in Figure 1 below. Figure 1 also identifies the three possible parking spots, two of which would utilize the charger, depending on where the EV charger is ultimately located. The charger would draw power from an electric panel located in the mechanical room at the eastern corner of the Fire Station. It is believed that existing capacity on the electric panel can support the charger. A conduit run would be installed on the exterior back wall of the Fire Station, outside this room, and then be buried underground to the EV charger. The EV charger would be free-standing, anchored to a concrete base per the EV charger's installation specifications. If Bidder believes that these charging conditions would be met at the lowest cost bid by installing two single port EV chargers instead, they are encouraged to propose this solution in their bid and explain it thoroughly.

Award

Fire / Police

$13,825.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
365
Active Projects
201
Bidding Soon
2,544
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2025

September 25, 2025

Project location map

525 W Michigan Ave, Ypsilanti, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.