BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 1, 2025 at 8:00 PM

Updated August 2, 2025

This is a service / maintenance or supply contract in Princeton, New Jersey. Contact the soliciting agency for additional information.

The services requested may include FAA grant application assistance, bidding and negotiating contracts, the development of an airport master plan, environmental assessments, and both the design and construction of various airport improvement projects, specifically the development of runways and taxiways. The contract term will initially be through the end of the fiscal year and following a successful initial period, the contract will be extended three (3) to five (5) years. The scope of the work may include but is not limited to the following: Development of Airport Master Plan Environmental assessments Design of runway and taxiways Construction of runway and taxiways Feasibility studies Contract bidding and negotiation The consultant selection will be completed by scoring and ranking the consultants based on the following: Experience in aviation consulting. (35%) Experience in procurement of Airport Master Plan or Airport Layout Plans. (10%) In house subject matter experts or strong relationships with contractors with such experts. (20%) Performance on previous projects, specifically time, budget, and quality. (25%) Physical location in proximity to the Princeton Airport. (10%) PAC will appoint a committee to review the submitted Statements of Qualifications and rank the qualified candidates. PAC may choose to interview a shortlist of candidates before making the selection. The candidates selected to be interviewed will be notified fourteen (14) days prior to the interview. All unsuccessful candidates will be notified no later than ten (10) days after the conclusion of the submission period. PAC reserves the right to reject any and all submissions to this RFQ, request for clarification, or waive informalities/technicalities, if it is deemed in the best interest of PAC. PAC assumes no responsibility for costs incurred in responding to this RFQ. In accordance with FAA selection procedures, all selections will be qualification based, and no overhead rate, fees, or cost information shall be identified as part of this submission. Projects are anticipated to begin in October 2025 and continue through September 2028.

Conceptual

Transportation Terminals

Public - Federal

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
912
Active Projects
327
Bidding Soon
7,316
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

41 Airpark Rd, Princeton, NJ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.