Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 4, 2025 at 8:00 PM
Updated August 5, 2025
Renovation of a mixed-use development in Newport, Rhode Island. Working plans call for the renovation of a medical facility.
This project involves a major renovation of King Hall OTC Dorm Building 291, a four-story cast-in-place reinforced concrete structure with a basement, located on the NAVSTA Newport, Rhode Island campus. The building, approximately 172,000 square feet in size, serves primarily as a residential dormitory for Officer Training Command (OTC), with additional occupants including Unaccompanied Housing and Naval Health Clinic New England (NHCNE). The renovation will address hazardous materials abatement, building envelope water infiltration, outdated mechanical and plumbing systems, electrical systems including power, lighting, security, and communications, as well as fire protection and detection systems. Life safety upgrades will be completed throughout the building. Exterior improvements include a new fire lane, full roof replacement, replacement of exterior windows and storefront entrances, and masonry repairs. The project also includes code compliance upgrades such as a new passenger elevator and seismic structural improvements. Interior reconfiguration will create new multipurpose areas on the first floor, relocate the SMART clinic from the third to the first deck, and involve minor renovations to existing NHCNE facilities. The project will be delivered as design-build. The estimated construction magnitude is between $100 million and $250 million, with a performance period of approximately 1,000 calendar days. Location: NAVSTA Newport, Rhode Island. The Method of Contractor Selection has not been determined at this Time. Question Deadline 08/11/2025 at 2:00 PM ET *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Medical
$250,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 1, 2025
690 Peary St, Newport, RI
Related To This Project
Newport, RI
Bid Date: Aug 28 2025
Newport, RI
Bid Date: Dec 17 2020
Newport, RI
Bid Date: Oct 14 2025
Newport, RI
Bid Date: Oct 22 2025
Newport, RI
Bid Date: Aug 20 2025
Newport, RI
Bid Date: Sep 04 2025
Newport, RI
Bid Date: Aug 25 2025
Newport, RI
Bid Date: Aug 28 2025
Newport, RI
Bid Date: Aug 18 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
