Published August 27, 2025 at 8:00 PM
Updated September 4, 2025
Site work for a water / sewer project in Blakely, Georgia. Completed plans call for site work for a water / sewer project.
PROJECT DESCRIPTION The project includes replacement and/or repair of various components of the airport's storm water drainage system, including pipes, headwalls, and other storm system structures. A Bidder's bond must be executed on the form furnished by the Owner, and the required bond, cash, cashier's check, or certified check must accompany each proposal, in the amount of 5% of the total amount of the proposal. A 100% performance bond and a 100% payment bond will be required of the Contractor at time of contract execution. A Georgia Resident Agent must countersign all bonds from a surety company authorized by law to do business in this State pursuant to a current certificate of authority to transact surety business by the Commissioner of Insurance; no bond shall be approved unless the surety is on the United States Department of Treasury's list of approved bond sureties. All work under the contract shall be completed within the number of calendar days associated with the awarded Schedule of Work from the issuance of the Notice to Proceed. Schedule of Work Contract Time 1 60 calendar days 2 90 calendar days 3 120 calendar days Technical questions shall be directed to Tiffany King (tking@passero.com) and must be received no later than August 25, 2025 @ 5:00 P.M. An addendum responding to questions received will be issued by the close of the business day on August 27, 2025 and posted to Passero Associates website via the projects bid tab. No pre-bid conference will be held for this project. The Project is comprised of two (2) distinct phases of work. Each phase consists of a work area with unique construction access, traffic control, and sequencing requirements. Refer to the CSPP, in Appendix C, for graphical depictions of the phases along with notes on phase specific sequencing and operational requirements. Phase 1 Work Area Phase 1 Work Area includes all work inside of the Runway Safety Area and Runway Object Free Area, during which time Runway 5-23 and all taxiways will be closed with the placement of closure markers and barricades. Phase 1 work generally includes demolition of existing storm drainage components, installation of new storm drainage components, grade restoration, pavement repairs, application of airfield marking, and stabilization of disturbed soils. Workoutside of the Runway Safety Area and Runway Object Free Area may be done concurrently with this Phase, provided the contractor can meet the allotted Phase 1 contract time. 3.2.2 Phase 2 Work Area Phase 2 Work Area includes all workoutside ofthe Runway Safety Area and Runway Object Free Area, during which time Runway 5-23 is open and all taxiways, excluding Taxiway D which provides access to the Terminal Apron, will be closed with the placement of closure markers and barricades. Phase 2 work generally includes demolition of existing storm drainage components, installation of new storm drainage components, grade restoration, pavement repairs, application of airfield marking, and stabilization of disturbed soils.
Post-Bid
Water / Sewer
$700,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2025
October 3, 2025
15302 Magnolia St, Blakely, GA
Related To This Project
Blakely, GA
Bid Date: Jun 30 2025
Blakely, GA
Bid Date: May 22 2025
Blakely, GA
Bid Date: Feb 19 2025
Blakely, GA
Bid Date: Jan 09 2025
Blakely, GA
Bid Date: Nov 25 2025
Blakely, GA
Bid Date: Mar 19 2019
Blakely, GA
--
Blakely, GA
Bid Date: Dec 19 2025
Blakely, GA
Bid Date: May 28 2024
Blakely, GA
Bid Date: Jun 07 2024
Blakely, GA
Bid Date: Jan 23 2024
Blakely, GA
Bid Date: May 14 2020
Blakely, GA
--
Blakely, GA
Bid Date: May 25 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.