BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 5, 2025 at 8:00 PM

Updated August 6, 2025

Site work and paving for a road / highway in Durham, California. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The City of Chico is requesting proposals from qualified firms (Proposer) to provide Professional Engineering Services for the Midway and Hegan Lane Roundabout Project. Services will include but are not limited to design, environmental compliance, right-of-way, PS&E, bidding support, and construction support. The City of Chico recently completed a Traffic Analysis Report to address long-standing congestion challenges associated with travel between commercial and industrial developments in southwest Chico, between Hegan Lane and the Park Avenue/State Route (SR) 99 interchange. The Traffic Analysis Report analyzed current and projected traffic demand along Otterson Drive, Hegan Lane, Midway, and East Park Avenue, and proposed phased intersection improvements that minimize disruption to the current circulation system. One of the proposed improvements is the conversion of the signalized intersection at Midway and Hegan Lane into a modern, multi-lane roundabout. Services to be performed under this PSA will include, but are not limited to the following tasks: Project Management Review of Existing Information Surveys and Base Mapping CEQA & NEPA compliance Utility Relocation Right-of-Way Services (surveys, appraisals, negotiations, and escrow coordination) Coordination with Butte County and Caltrans Local Assistance Final Design and PS&E development (35%, 65%, 95%, 100%, and RTL submittals) Bidding and Construction Support. This project is located at the intersection of Hegan Lane and the Midway, just outside of the City of Chico limits, within unincorporated Butte County, and inside the City of Chico's Sphere of Influence boundary. Direct contact with City departments or staff regarding this RFP is prohibited. Information provided by anyone other than the designated point of contact listed in Public Purchase may be invalid, and Proposals based on such information may be deemed non-responsive. If revisions to this RFP become necessary, addenda will be issued and posted on this RFP page. Proposers are responsible for monitoring this RFP page for addenda. Failure to retrieve and acknowledge addenda, as required, may result in the rejection of your Proposal. All proposals must remain valid for 120 days from the Proposal submission date for receipt of proposals. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$700,000.00

Public - City

Paving, Site Work

3

5

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
46
Bidding Soon
495
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2026

Project location map

Midway & Hegan Ln, Durham, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.