BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 6, 2025 at 8:00 PM

Updated August 7, 2025

Demolition, site work and asbestos abatement for a hospitality development in Vernal, Utah. Completed plans call for the demolition of a hospitality development; for site work for a hospitality development; and for asbestos abatement for a hospitality development.

The City of Vernal (referred to as "Owner") is seeking proposals from qualified and licensed asbestos abatement contractors to provide all labor, materials, equipment, and disposal necessary to remove and properly dispose of all asbestos-containing materials (ACM) identified in the Asbestos Inspection Report The selected contractor will be responsible for: Review & Confirmation Review the Asbestos Inspection Report (Exhibits A & B) and confirm the locations and materials identified as asbestos-containing. Scope of Abatement Only materials containing greater than 1% asbestos--as defined by EPA and OSHA regulations (40 CFR Part 763 and 29 CFR 1926.1101)--are included in this abatement scope. Materials with <=1% asbestos are not required to be abated and should be left in place or managed per applicable safety guidelines. The intent is to limit abatement to regulated materials to reduce unnecessary costs and avoid disturbing non-regulated materials. This project is being conducted as part of the planned demolition and redevelopment of the property. All work must comply with applicable federal, state, and local regulations, including but not limited to, Utah Department of Environmental Quality (UDEQ), Environmental Protection Agency (EPA), and Occupational Safety and Health Administration (OSHA) requirements. Expected Start Date: Fall 2025 Required Completion Date: Spring 2026 Project Description- The City of Vernal (referred to as “Owner”) is seeking proposals from qualified and licensed asbestos abatement contractors to provide all labor, materials, equipment, and disposal necessary to remove and properly dispose of all asbestos-containing materials (ACM) identified in the Asbestos Inspection Report (Exhibit A & B) for the Lamplighter Property, located at: 120 East Main Street, Vernal Utah 84078 This project is being conducted as part of the planned demolition and redevelopment of the property

Sub-Bidding

Hotel / Motel

$300,000.00

Public - City

Asbestos Abatement, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
4
Bidding Soon
68
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2025

September 22, 2025

Project location map

120 E Main St, Vernal, UT


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.