Demolition, site work, paving, new construction and renovation of a mixed-use development in Shenandoah, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for the demolition of a water / sewer project; for the renovation of a water / sewer project; water / sewer project; and for the construction of a water / sewer project.

The Project includes the following Work: CONTRACT 1 - GENERAL/MECHANICAL Construction of a new headworks building including screening, grit removal, and all related items, new UV/Blower Building including blowers, mixing system, and UV disinfection system, rehabilitation of the existing office/control building, new SBR tanks, new digestion tanks, new aeration/pumping/disinfection system, new chemical feed system, utility water system, sludge pumps. The project also includes the demolition of existing tanks and buildings, construction of a new access road from SR 0054, reconstruction of site roadways and parking lot, installation of stormwater drainage system and detention pond. Construction also includes other miscellaneous associated site improvements. Bid Questions All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer via the PennBid program no later than Tuesday, September 10, 2025, at 10:00 AM. Owner anticipates that the Project's total bid price will be approximately $21,200,000. The Project has an expected duration of 550 days. Bid will remain subject to acceptance for sixty (60) days after the Bid opening, except if the award is delayed by a required approval of another government agency (including RUS), the sale of bonds, or the award of a grant, the Owner shall reject all bids or award the contract to the lowest responsible and responsive bidder within ninety (90) days of the bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner Construction of a Headworks Building (Building 100), including but not limited to the following: Excavation and placement of Temporary Excavation Support System Engineered Fill Foundation Placement Building Construction Service and access platform, stairs, and supports Hoist beam and hoist Mechanical Screen Screening Compactor Washer Manual Bar Screen Grit Collector and Pump j. Electrical Room. k. Piping and Utility supports l. Dumpster and Dumpster Guide System m. Electrical and HVAC systems. Upgrade to the existing Raw Wastewater Pump Station Building (Building 200), including but not limited to the following: New Pumps New Sump Pumps Mechanical\HVAC Upgrades Control Upgrades Exterior Building Washing EDPM RoofReplacement Hatch, grating, and railings. Construction of new concrete Treatment/Digestor Tanks (Building 300) including but not limited to the following: Excavation Foundation Placement with engineered fdl and aggregate piers Precast, post-tensioned concrete tanks Control Equipment Stairs and Railings Pumping Equipment Piping Mixing Equipment Construction of a new UV Building (Building 400), including but not limited to the following: Excavation Foundation Placement with engineered fdl and aggregate piers Building Construction UV Room 1) UV Disinfection System Blower Room 1) Mechanical Blowers 2) Digester Mixing System Electrical Room Piping and Utility supports Air compressor Electrical and HVAC systems Upgrade to the existing Chlorine Contact Tank, Chemical System Pad, Generator Pad (Building 500), including but not limited to the following Pad Construction Piping Connection Chemical Pumps Chemical Tanks Generator Heat Tracing Flow Metering Equipment Weir replacement Upgrade to the existing Control Building (Building 600), including but not limited to the following Laboratory Upgrades Restroom\Shower Upgrades Operator Office (2) Upgrades Meeting/Break Room Addition Electrical Room Workshop Room Sludge Pump Room Utility Water Pumps Awning replacements EDPM roofreplacement Digestor Lid replacement with Geodesic Dome. Exterior Building Washing Upgrade to the existing Pump Station #1 (Building 700), including but not limited to the following: Flow Metering Equipment b. Control Upgrades 8. Existing Garage a. Exterior Building Washing b. MechanicahHVAC Upgrades 9. Site improvements. 10. Structure demolition. 11. Associated electrical construction. 12. Associated integration construction. 13. Special Inspections. 14. Work indicated in the Contract Documents. QA: Pump Station 1 is located at 730 W Centre St (Route 54), just across the street from the Shenandoah Valley High School Linked to The Project has an expected duration of 550 days

Bid Results

Water / Sewer

$32,870,000.00

Public - City

Demolition, New Construction, Paving, Renovation, Site Work

320

58

90

6

Subscribe For Documents

133 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
425
Active Projects
251
Bidding Soon
2,654
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2025

November 24, 2025

Project location map

5 Mount Olive Blvd., Shenandoah, PA


Fuel growth with access to the bidding project info your business needs.