BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2025 at 8:00 PM

Updated October 29, 2025

Site work for a water / sewer project in Long Beach, California. Completed plans call for site work for a water / sewer project.

The work consists of installation of 12-, 16-, and 24-inch DR17 HPE recycled water and sewer force main pipelines and their associated appurtenances, including a trenchless crossing under SR-22, and a bridge crossing along College Park Drive. Begin Date: 11/01/2025 End Date: 11/01/2027 DESCRIPTION OF WORK: Work includes at a minimum but not limited to the following: furnishing products, labor, tools, transportation, and services to install the following new infrastructure: 1. 12-inch DR17 HDPE recycled water pipeline hot tap connection at Atherton Street. 2. 24-inch DR17 HDPE recycled water pipelines. 3. 16-inch DR17 HDPE recycled water pipelines. 4. 12-inch DR11 HDPE sewer force main pipelines. 5. 8-inch CL52 epoxy lined and coated DIP sewer force main pipelines. 6. 16-inch welded steel pipe epoxy lined and epoxy coated pipe (WSP) supported by the College Park Drive bridge structure. 7. 8-inch epoxy lined and coated DIP within 16-inch welded steel casing supported by College Park Drive bridge structure. 8. Trenchless crossings under Caltrans SR22. 9. 12-inch DR 11 HDPE sewer force main pipeline within casing under Caltrans SR22. PRE-BID CONFERENCE: Prospective bidders are required to attend a two-part pre-bid conference with the Long Beach Public Utilities Department (LBUD) and LBUDs representatives. Part 1 will be an online meeting presentation of technical parameters at 10:00 AM on Wednesday, August 13, 2025 to present the scope of work to be performed under these specifications. Part 2 will be a site visit at 2:00 PM on Wednesday, August 13, 2025 to allow bidders to see the site conditions. Site visit location will be at the Haynes Generating Station located at: 6801 2nd St, Long Beach, CA 90803. Request the pre-bid conference information for the online meeting and site visit by sending an e-mail to Danna Monzon at Danna.Monzon@lbwater.org and include in the subject line LADWP Haynes Generating Station RW Pipeline: RSVP to Pre-Bid Conference

Award

Water / Sewer

$20,520,686.00

Public - City

Site Work

59

21

33

3

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
3
Bidding Soon
2,275
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2025

November 7, 2025

Project location map

Multiple Locations, Long Beach, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.