Published September 23, 2025 at 8:00 PM

Updated September 24, 2025

Site work and paving for a mixed-use development in Elk Grove, California. Completed plans call for site work for a 2,630-square-foot sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The site improvements include adding approximately 2,630 SF of new asphalt concrete paving, and approximately 75 SF of Portland cement concrete pavement. SacSewers EchoWater Facility provides a Septage Disposal Facility for liquid water haul trucks. A new disposal facility was recently constructed, but the larger tanker trucks need better access to the facility by modifying the approach and exit routes with a larger turning radius. The site improvements include adding approximately 2,630 SF of new asphalt concrete paving, and approximately 75 SF of Portland cement concrete pavement. Additional items of work include material excavation, material hauling. supply and placement of Aggregate Base material, rebar, site grading, and all other incidentals required to compete the site improvements. Bid bond/deposit not less than ten (10) percent of the aggregate total bid is required to be submitted with the sealed bid. Successful Bidder must furnish a 100 percent Performance Bond and Payment Bond per Appendix E and Appendix D respectively. Sac Sewer (Echo Water) reserves the right to reject any or all bids and waive any irregularity in bids received. Contract Award: September 17, 2025 Notice to Proceed: October 1, 2025 Project Completion: November 14, 2025* The project contact for this RFB is: Scott Mueller, PE Project Engineer SacSewer (EchoWater) muellers@sacsewer.com Liquidated damages shall be $500 for each calendar day delay beyond "Project Completion" final date. In Addition, The Septage Disposal Facility will need to be shut down for this work. The contractor shall coordinate with district staff to schedule the start the Field Work on a Monday with the total duration limited to 5 consecutive Calendar Days to accommodate the shortest Shutdown possible. Saturday can be used for miscellaneous cleanup if required.) Questions Due : August 27, 2025Questions regarding this RFB should be directed in writing to the Issuing Officer specified on the Cover Sheet, page 1. Answers, citing the question, but not identifying the questioner, will be distributed simultaneously to all known prospective Bidders. The issuing officer and mailing address to send Bids, questions, and all other correspondence concerning this RFB is: Tamblynn Stewart Senior Contract Services Officer SacSewer (EchoWater) (916) 875-9014 stewartt@sacsewer.com) (The purpose of the meeting is to review and clarify project requirements, respond to questions from the bidders and allow prospective bidders the opportunity to visit the location of the work. It is the responsibility of prospective bidders to familiarize themselves with all requirements of the solicitation and identify any issues at this meeting.)

Award

Sidewalks / Parking Lot

$64,500.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
486
Active Projects
201
Bidding Soon
2,937
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2025

October 3, 2025

Project location map

8521 Laguna Station Rd, Elk Grove, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.