BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 24, 2025 at 8:00 PM

Updated October 25, 2025

Renovation of a mixed-use development in Boulder, Colorado. Working plans call for the renovation of an educational facility and theater / auditorium.

The owner has determined a prequalified list of construction managers. Reference Number 0000395270 This posting is for the CM/GC Fee Proposal submission. Please see other UCB001401 CM/GC RFP posting for qualifications submission. The University of Colorado Boulder (CU Boulder) seeks a qualified Construction Manager/General Contractor (CM/GC) for multiple renovation projects on campus that will be used by the Sundance Fillm Festival (SFF). Starting in January 2027, SFF is relocating to Boulder, Colorado and will be using facilities on the CU Boulder campus for portions of the festival. It is anticipated that two to three venues on campus will be utilized by SFF for film screenings and events. In preparation for these events, the university is working with SFF to make modifications to specific campus buildings to meet SFF's needs. Campus venues being considered for use by SFF include Macky Auditorium, Roe Green Theatre at the University Theatre building, Muenzinger E050, and Chemistry 140. The general scope of work is focused on audio/visual (AV) upgrades (including cable pathways, new electrical loads and structural modifications for to hang new AV systems) and may also include accessibility improvements, though the work will vary depending on specific location. To ensure sufficient information is available to firms preparing submittals, a mandatory pre-submittal conference has been scheduled. The intent of this conference is to have CU Boulder staff discuss the project. Firms preparing submittals must attend and sign-in to have their submittals accepted. The University of Colorado Boulder (CU Boulder) seeks a qualified Construction Manager/General Contractor (CM/GC) for multiple renovation projects on campus that will be used by the Sundance Fillm Festival (SFF).", "Starting in January 2027, SFF is relocating to Boulder, Colorado and will be using facilities on the CU Boulder campus for portions of the festival.", "It is anticipated that two to three venues on campus will be utilized by SFF for film screenings and events.", In preparation for these events, the university is working with SFF to make modifications to specific campus buildings to meet SFF's needs.", "Campus venues being considered for use by SFF include Macky \nAuditorium, Roe Green Theatre at the University Theatre building, Muenzinger E050, \nand Chemistry 140.", "The general scope of work is focused on audio/visual (AV) upgrades (including cable pathways, new electrical loads and structural modifications for to hang new AV systems) and may also include accessibility improvements, though the work will vary depending on specific location. Anticipated Construction Start/Finish 5/4/26 - 8/19/26 Question Deadline 08/27/2025 at 5:00 PM MT Questions are submitted online Yes, Questions and requests for clarifications regarding this project shall be submitted before the deadline listed in the above Schedule. POINT OF CONTACT/CLARIFICATION Name: Josh Porosky Agency: University of Colorado Boulder - Design & Construction Email Address: Joshua.porosky@colorado.edu Phone: 720-345-7161 The State reserves the right to reject any or all proposals on the basis of being unresponsive to this RFP or for failure to disclose requested information.

Final Planning

Theaters / Auditoriums

$1,500,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2025

May 2, 2026

Project location map

Multiple Locations, Boulder, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.