BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2025 at 8:00 PM

Updated August 23, 2025

Site work and paving for a mixed-use development in Renton, Washington. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

Technical questions about the project shall be addressed to: Greg Reince, Century West Engineering, at greince@centu-rywest.com and William Adams, City of Renton, at wadams@rent-onwa.gov. This is a prevailing wage proj-ect per State and Federal Laws. All labor on the project shall be paid no less than the minimum wage rates established by the Washington State Department of Labor and Industries or Davis-Bacon Act, whichever is greater. This contract will be funded, in part, by a grant from the Federal Aviation Administration. As such, it will be subject to federal requirements. These include, but are not limited to 1) Buy American Preference 2) Foreign Trade Restriction 3) Davis Bacon 4) Government wide Debarment and Suspension 5) Government Requirements Workplace wide for Drug-free 6) Federal Fair Labor Standards Act All Federal provisions are given in the specifications under FAA Required Provisions. The Engineer's estimate for construction of the base bid sched-ules (Schedule A + Schedule G) is $15-$18 million. A total of 135 calendar days is allowed for completion of Phase 1 and a total of 79 calendar days is allowed for completion of Phase 2. The City will issue multiple Notice to Proceed (NTP) dates as outlined below. For detailed information on NTP dates and contract times for each phase of work, see Information for Bidders, Section 80-08 of the General Provisions, and the Construction Safety and Phasing Plan drawings. The DBE goal for this contract is 7.98% of the AIP-eligible bid schedules (Schedule A, Schedule B, Schedule G, Schedule H, Schedule D. Schedule F, and Schedule K). All prospective Bidders are direct-ed to the Information for Bidders with regard to the procedures the City of Renton will utilize to achieve this goal. Bidders must meet the DBE goal or provide good faith effort documentation for all Award Alternatives. A certified check or bid bond in the amount of five percent (5%) of the total of each bid must accompany each bid. AIP #3-53-0055-032-2023 Any prospective Bidder desiring an explanation or interpretation of the Bid Documents, shall request the explanation or interpretation in writing by the close of business five (5) business days preceding the bid opening to allow a written reply to reach all prospective Bidders before the submission of their Bids. Questions received less than five business days prior to the date for opening of Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral explanations, interpretations, or instructions given by anyone before the Award of Contract will not be binding on the City of Renton. 3. The Owner's representative for the project is Century West Engineering (Engineer). Technical questions about the project should be directed to Greg Reince, Century West Engineering and William Adams, City of Renton: o Submit questions via e-mail to: greince@centurywest.com and wadams@rentonwa.gov. Put "Taxiway A Rehabilitation and Associated Improvements" in the subject line. No other type of inquiry will be accepted. Event bid open note: The bid opening meeting can be accessed via videoconference by: Clicking this link to join the Zoom meeting: https://us06web.zoom.us/i/86876598050pwd=R78E vcJ660QthV4B1LUWTmI7 kin71.1 Using the Zoom app: Meeting ID: 868 7659 8050; Passcode: 964580 Via telephone by dialing: 12 532158782,,86876598050#,,,,*96 4580# Zoom is free to use and is available at https://zoom.us/. The City reserves the right to reject any and/or all bids and to waive any and/or all informalities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Schedule A - Pivetta Brothers Construction, Inc - 96,77,795.46 Schedule B - Active Construction, Inc - 7,84,249.55 Schedule C - Ceccanti - 4,45,545.82 Schedule D - Active Construction, Inc - 3,79,829.08 Schedule E - Ceccanti - 3,32,697.89 Schedule F - Pivetta Brothers Construction, Inc - 4,70,447.15 Schedule G - Scarsella - 47,18,405.73 Schedule H - Ceccanti - 2,52,112.71 Schedule I - Ceccanti - 2,21,537.55 Schedule J - Ceccanti - 4,28,846.40 Schedule K - Scarsella - 2,01,934.81

Bid Results

Transportation Terminals

$17,913,403.00

Public - City

Paving, Site Work

185

13

8

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
94
Bidding Soon
1,376
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2025

September 15, 2025

Project location map

243 W Perimeter Rd, Renton, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.