BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 20, 2025 at 8:00 PM

Updated August 21, 2025

Site work and paving for a road / highway in Bridgeport charter Township, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

HMA Mill and Resurface M-81 Wolf Road to Towerline Road. Project Schedule: Work may begin immediately after receiving approval from MDOT. Work to be completed between September 8, 2025, to September 30, 2025. The project work hours will be Monday through Thursday, 8:00pm to 6:00am nightly. No work will be allowed from Friday night through Sunday night. Once work begins, it must be completed in four (4) consecutive days. Notice must be provided to Dan Senske at 989-233-1053 at a minimum of three (3) calendar days prior to beginning the work. Temporary pavement markings will be placed at the end of the night's work, prior to opening to traffic. Permanent pavement markings will be placed within 7 days of completion of the HMA paving operation. Description of work: The work shall consist of 0.53 miles of 2-inch Cold Milling HMA Surface, 2-inch HMA, 5EML, High Stress paving of the three-lane roadway and shoulders, temporary and permanent pavement markings. The HMA shoulder widths vary on this project. Contractor is required to cold mill and pave to edge of existing shoulders or as directed by engineer Question Deadline Aug 14, 2025 at 3:00 PM Online question submitted .

Award

Roads / Highways

$242,521.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
123
Bidding Soon
1,708
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2025

September 8, 2025

Project location map

M-81, Bridgeport charter Township, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.