Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 5, 2025 at 8:00 PM
Updated September 6, 2025
Demolition, site work, paving and new construction of a civil project in Durand, Wisconsin. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
Work under this contract to include removing structure, timber structure, excavation, base aggregate dense, asphaltic surface, riprap and all incidental items necessary to complete the work as shown on the plans and included in the special provisions. All work located on North Spring Creek Road is limited to the Spring Creek crossing and approaches, 0.18 miles north of Spring Creek Rd intersection in the Town of Maxville. All work is located on North Spring Creek Road and is 0.024 miles in length. This project is funded through the Wisconsin Department of Transportation Agricultural Roads Improvement Program (ARIP). Work includes excavation, removing the existing structure, timber structure B-06-0249 and associated roadway work. Est. Value Notes: $350,000 - $400,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Est. Completion Date: Sept. 15, 2026
Post-Bid
Roads / Highways
$400,000.00
Public - City
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2025
October 6, 2025
Spring Creek Rd, Durand, WI
Related To This Project
Durand, WI
Bid Date: Jun 09 2020
Durand, WI
Bid Date: Nov 13 2025
Durand, WI
Bid Date: Apr 03 2025
Durand, WI
Bid Date: Mar 10 2025
Durand, WI
Bid Date: Mar 10 2025
Durand, WI
Bid Date: Mar 20 2025
Durand, WI
Bid Date: Oct 24 2024
Durand, WI
Bid Date: Oct 14 2025
Durand, WI
Bid Date: Aug 06 2024
Durand, WI
Bid Date: Apr 19 2024
Durand, WI
Bid Date: Mar 07 2024
Durand, WI
Bid Date: Jan 18 2024
Durand, WI
Bid Date: Jan 10 2024
Durand, WI
Bid Date: Nov 30 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
