BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 5, 2025 at 8:00 PM

Updated September 6, 2025

Demolition, site work, paving and new construction of a civil project in Durand, Wisconsin. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Work under this contract to include removing structure, timber structure, excavation, base aggregate dense, asphaltic surface, riprap and all incidental items necessary to complete the work as shown on the plans and included in the special provisions. All work located on North Spring Creek Road is limited to the Spring Creek crossing and approaches, 0.18 miles north of Spring Creek Rd intersection in the Town of Maxville. All work is located on North Spring Creek Road and is 0.024 miles in length. This project is funded through the Wisconsin Department of Transportation Agricultural Roads Improvement Program (ARIP). Work includes excavation, removing the existing structure, timber structure B-06-0249 and associated roadway work. Est. Value Notes: $350,000 - $400,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Est. Completion Date: Sept. 15, 2026

Post-Bid

Roads / Highways

$400,000.00

Public - City

Demolition, New Construction, Paving, Site Work

22

7

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
156
Bidding Soon
1,332
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2025

October 6, 2025

Project location map

Spring Creek Rd, Durand, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.