Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 18, 2025 at 8:00 PM
Updated August 30, 2025
Renovation of a laboratory facility in Batavia, Illinois. Completed plans call for the renovation of a laboratory facility.
RFP#369811 - EOL Fire Door Replacement Subcontractor shall perform the following: 1. Perform pre-job briefing with TM/CC to discuss job hazards and ways those hazards will be mitigated / minimized. 2. Mobilize to Wilson Hall. 3. Perform Lock Out/Tag Out (LOTO) as necessary to safely isolate any electrical components. 4. Safely chain existing rolling fire door in place (inoperable). 5. Ensure proper disposal or recycling of removed components per local regulations. 6. Inspect the mounting area for structural integrity and readiness for new installation. 7. Supply and install a new UL-listed and NFPA 80-compliant motor-operated rolling fire door with equivalent or superior specifications to the existing unit. Approximate door opening 12'-0" W X 12'-9" H. Door specifications are listed in the equipment section below. 8. Ensure the new door meets applicable fire resistance ratings and all Illinois and federal building code requirements. 9. Provide a new motorized operator with appropriate horsepower and voltage compatibility. Specific operator requirements are listed in the equipment section below. 10. Install necessary electrical connections, controls, and safety devices. 11. Ensure proper sealing and alignment of the door for fire protection and operational efficiency. 12. Conduct functional testing of the fire door, including automatic closing mechanisms, manual release, and motor operation. 13. Perform drop tests per NFPA 80 requirements to verify fire door performance. 14. Ensure the safety features, including sensors and emergency operation mechanisms, are functioning correctly. 15. Provide documentation of successful testing and certification. 16. Provide operational training for facility personnel on proper usage and maintenance. 17. Supply manufacturer's documentation, including operation manuals, maintenance requirements, and warranty details. 18. Dispose of all removed equipment and waste in dumpster provided by FFDG or as otherwise directed 19. Ensure any LOTO placed has been removed and all equipment is not functional. 20. Perform close out of job site. a. Ensure all tools, equipment, and waste are removed. b. Perform turnover / closeout of job with TM/CC. EST START DATE: 6/2/2025 EST END DATE: 12/31/2025 The prospective offeror should examine and review the solicitation with care. Any prospective offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing by 5 P.M. Central Time, August 22, 2025
Post-Bid
Laboratories
$70,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
13
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 29, 2025
September 29, 2025
Kirk Rd & Pine St, Batavia, IL
Related To This Project
Batavia, IL
Bid Date: Sep 03 2025
Batavia, IL
Bid Date: Oct 03 2025
Batavia, IL
Bid Date: Sep 17 2025
Batavia, IL
Bid Date: Oct 09 2025
Batavia, IL
Bid Date: Sep 15 2025
Batavia, IL
Bid Date: Sep 17 2025
Batavia, IL
Bid Date: Nov 18 2025
Batavia, IL
Bid Date: Sep 03 2025
Batavia, IL
--
Batavia, IL
Bid Date: Aug 18 2025
Batavia, IL
--
Batavia, IL
Bid Date: Sep 23 2025
Batavia, IL
Bid Date: Jul 01 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
