BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2025 at 8:00 PM

Updated September 13, 2025

This is a service / maintenance or supply contract in Sacramento, California. Contact the soliciting agency for additional information.

The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for a Job Order Contract. A Job Order Contract (hereinafter called JOC) is a competitively bid, firm fixed priced indefinite quantity contract. The contract documents include a Construction Task Catalog(R) containing a collection of detailed repair and construction tasks and specifications that have established Unit Prices. All Unit Prices are based on local labor, materials and equipment prices and are for the direct cost of construction. Ordering is accomplished by means of issuance of a Task Order pursuant to the Contract. PRE-BID QUESTIONS DUE VIA Q&A: Date: Monday, September 1, 2025 No later than: 5:00 pm Question Deadline 09/01/2025 at 5:00 PM PT Direct pre-bid questions to the Project Manager, Maria Real, via the Q&A tab in the portal ESTIMATED CONSTRUCTION COST: $0 (minimum) to $6,210,093 (maximum) each. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Each bid must be submitted on the bid forms provided in the Contract Documents; however, if none are provided, the surety may issue on its own paper. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the Treasurer of Sacramento County, or cash for an amount not less than $25,000. The successful bidder shall be required to execute a material and labor Payment Bond and Performance Bond, issued by a corporate surety, acceptable to the County of Sacramento, each for not less than one hundred percent (100%) of the contract price.

Award

Transportation Terminals

$6,210,093.00

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2025

November 10, 2025

Project location map

Multiple Locations, Sacramento, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.