Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 19, 2025 at 7:00 PM
Updated December 20, 2025
Site work and new construction of a municipal facility in Medway, Massachusetts. Completed plans call for the construction of a 79,000-square-foot municipal facility; and for site work for a municipal facility.
This Cm at Risk Services Procurement is Conducted Pursuant to M.g.l. Chapter 149a, Contained in Chapter 193 of the Acts of 2004. This Request for Qualifications ("rfq") is the First Phase of a Two-phase Procurement Process as Set Forth in Mgl Chapter 149a. The Medway Municipal Complex Building Committee is Prequalifying Firms Interested in Providing Public Cm at Risk Services for the Project Through This Rfq Process. The Submitted Statement of Qualifications ("soq's") Will Be Evaluated Based Upon the Identified Evaluation Criteria and the Prequalification Committee Will Select Those Respondents It Deems Qualified. The Medway Municipal Complex Building Committee Expects the Review of the Soq's to Be Complete and the Issuance of the Rfp to Occur Mid-january 2026. Firms Interested in Being Prequalified Must Demonstrate That They Have Prior Experience as a Cm. the Town Desires to Design and Construct a New Public Safety (Police and Fire) and Town Hall Complex Located at 120 Main St., Medway (8+ Acres), Site of the Former Medway Block. It is Expected That the Project Will Be Built Upon and Around a Concept Plan That Will Provide for Appropriate Space for a Police Department, Fire Department, Police/fire Dispatch Department, and a Town Hall. The Solution Will Consist of Construction of an Approximate 79,000 Gsf Building Complex. The Sitework Consists of All New Stormwater Drainage, New Utilities, New Parking Lots, New Vehicular Paths, New Landscaping, Etc. The Estimated Construction Duration is 24-months. The Estimated Construction Cost of the Project is Seventy-three Million Dollars ($73,000,000.00). Certain Trade Construction Work Will Be Procured Using Procedures Similar to the M.g.l. Chapter 149 Filed Sub-bid Laws After a Prequalification Process. This Procedure is Specified in Chapter 193 of the Acts of 2004 in the Massachusetts General Laws Chapter 149a.
Post-Bid
Municipal
$73,000,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 17, 2025
August 17, 2026
120 Main St, Medway, MA
Related To This Project
Medway, MA
--
Medway, MA
Bid Date: Oct 08 2025
Medway, MA
Bid Date: Nov 12 2025
Medway, MA
Bid Date: Oct 29 2025
Medway, MA
Bid Date: Oct 22 2025
Medway, MA
Bid Date: Dec 03 2025
Medway, MA
Bid Date: Feb 05 2026
Medway, MA
Bid Date: Feb 03 2026
Medway, MA
Bid Date: Aug 21 2025
Medway, MA
--
Medway, MA
Bid Date: May 08 2025
Medway, MA
Bid Date: Apr 17 2025
Medway, MA
Bid Date: Apr 10 2025
Medway, MA
Bid Date: Apr 10 2025
Medway, MA
Bid Date: Apr 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.