BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2026 at 7:00 PM

Updated January 21, 2026

Renovation of a municipal facility in Medway, Massachusetts. Completed plans call for the renovation of a municipal facility.

Every request for such interpretation should be in writing addressed to Peter Pelletier, Director of Public Works, Town of Medway, 45B Holliston Street, Medway, MA 02053, and to be given consideration must be received at least seven days prior to the date fixed for the opening of bids. Question Deadline 11/26/2025 Asbestos Abatement - Office BuildingSUMMARY A. Furnish all labor, equipment, materials, and services necessary to remove, transport and dispose of asbestos containing materials at the Former Office Building and Adjoining Storage Garage at 120 Main Street in Medway, Massachusetts. B. Prior to the start of asbestos abatement, the site must be completely fenced with locked gates to prevent unauthorized access. The site shall remain fenced with gates locked until completion of the contract. The Contractor shall allow access to the Town of Medway and its engineers and consultants. C. It is the intent of this contract to remove asbestos containing materials to allow for demolition of the building. The identified asbestos containing materials and approximate quantities at the Former Office Building and Adjoining Storage Garage are included in Table 02 82 13-1 on Page 3 of this specification. D. The work of this Section must be coordinated with the work of Section 02 81 00 Transportation and Disposal of Hazardous Materials, 02 83 13 Lead Safe Work Practices and other applicable Sections. E. The Contractor shall have the opportunity to observe the building and the locations, quantity, and conditions of asbestos containing materials located in the building. The work of this section includes the removal of all materials from the building in order to allow for demolition of the building. F. Asbestos containing materials identified in this specification shall be removed in their entirety. Quantities provided in Table 02 82 13-1 are estimates only. The Contractor shall include complete removal of asbestos containing materials in the lump sum bid, with the exception of asbestos containing damp proofing, for which a unit price shall be included in the Contractor's bid.

Award

Municipal

$20,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
9
Bidding Soon
2,667
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2025

January 2, 2026

Project location map

120 Main St, Medway, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.