Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 24, 2025 at 8:00 PM
Updated October 25, 2025
Renovation of an educational facility in Medway, Massachusetts. Completed plans call for the renovation of a educational facility.
A. In general, the Contractor shall supply all labor, equipment, temporary protection, tools, and appliances necessary for the proper completion of the work as required in the Specifications, in accordance with good construction practice, and as required by the materials manufacturer, as amended. B. The work under this project generally includes an HVAC systems design for three (3) new replacement high-efficiency gas-fired condensing hot water boilers with primary circulator pumps and main header piping to replace the three (3) existing boilers with associated primary circulator pumps. The new boilers shall connect to existing hot water piping and associated primary circulator pumps and pump distribution secondary system. The new boiler plant will be provided with a new direct digital control system with a BACnet protocol, and the new boiler plant controls will be integrated into the existing building management system. C. The three (3) boilers are individually vented through the roof and have a combustion air louver through the roof. D. Furnish all staging, rigging, temporary support, labor, materials, and perform all operations in connection with the installation of the project scope. E. The building is to be commissioned and the Contractor shall provide all labor required to fully test and demonstrate that all systems operate as designed. F. Examine and coordinate with all other sections of the specifications for the requirements that affect work of the project scope, including coordination of work with all other trades. G. Supply all necessary chutes, disposal facilities, transportation, and labor necessary to dispose of all demolished materials, dirt, and debris off-site in a legal dumping area. Each Contractor and sub-contractor shall obtain all permits necessary to transport and dispose of all materials, rubbish, and debris impacted by their scope of work. H. Provide and maintain temporary protection of all building components designated to remain or new components installed throughout the duration of construction. Question Deadline 10/15/2025 at 3:00 PM ET All questions or requests for interpretations must be made in writing and submitted to the Architect/Engineer by the Bidder for general bids. Boiler Replacement and Associated Work at Medway High School, 88 Summer St., Medway, MA 02053. Sub Bid Category Plumbing and Electrical Bid Result Plumbing - NB Kenney Company - $23,829 Electrical - General Air Conditioning & Heating Inc - $29,500
Bid Results
Educational
$53,329.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 22, 2025
May 4, 2026
88 Summer St, Medway, MA
Related To This Project
Medway, MA
Bid Date: Dec 03 2025
Medway, MA
Bid Date: Nov 12 2025
Medway, MA
Bid Date: Oct 08 2025
Medway, MA
--
Medway, MA
Bid Date: Dec 17 2025
Medway, MA
Bid Date: Aug 21 2025
Medway, MA
--
Medway, MA
Bid Date: May 08 2025
Medway, MA
Bid Date: Apr 17 2025
Medway, MA
Bid Date: Apr 10 2025
Medway, MA
Bid Date: Apr 10 2025
Medway, MA
Bid Date: Apr 07 2025
Medway, MA
Bid Date: Mar 21 2025
Medway, MA
Bid Date: Mar 19 2025
Medway, MA
Bid Date: Feb 20 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
