Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 20, 2025 at 8:00 PM
Updated August 27, 2025
Renovation of a military facility in Dahlonega, Georgia. Completed plans call for the renovation of a military facility.
The project consists of replacing the existing failing asphalt roof system and roof deck in entirety (including the covered outdoor deck) and to make necessary repairs of all deficiencies, including structural repairs in conjunction with the roof replacements with a minimum 24-guage standing seam metal roofing system with 20_year warranty NDL, No Dollar Limit, and additional finish warranty that includes color fading for metal roofing. Schedule Contract Period - 300 All questions should be submitted in written form either by hand delivered hard copies or electronic mail (e-mail). The Contracting Officer (KO / COR) shall determine the final date for submission of questions. The project consists of replacing the existing failing asphalt roof system and roof deck in entirety (including the covered outdoor deck) and to make necessary repairs of all deficiencies, including structural repairs in conjunction with the roof replacements with a minimum 24-guage standing seam metal roofing system with 20-year warranty NDL, No Dollar Limit, and additional finish warranty that includes colorfading for metalroofing. The project consistsofreplacing the roofsystem, including the existing roofdeck, in entirety. Other work required to complete this scope is included in the attached Construction Condition Summary (CCS) and Roof Inspection report completed by third party. This may consist of repairs and/or replacing curbs, drains, rotten wood, louvers, roof vents, roof exhausts, sealant degradation, adding insulation, etc. The replacement of certain components may be required based on the type of roof system, any deficiencies to be repaired. All gutters, roof flashing, and wood siding above the roofto be replaced. Wetinsulation and organic growth has been identified in/on the existing roof. The government assumes mold remediation must occur in areas of wet insulation and organic growth that have been identified. Assume up to 5% of building square footage for mold remediation. Areas of roof decking is currently sagging, assume up to 5% of roof trusses and joists to be replaced in addition to the roof deck to address the structural deficiencies identified in the attached third-party CCS. Contractor must also ensure proper attic ventilation is to current standards in the new roof system. Importance is also placed on ease of future maintenance and longevity of the roofing system. Contractor to install new lightning protection with UL label
Post-Bid
Military
$120,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 26, 2025
September 25, 2025
1 Merrill Dr, Dahlonega, GA
Related To This Project
Dahlonega, GA
Bid Date: Aug 24 2025
Dahlonega, GA
Bid Date: Aug 27 2025
Dahlonega, GA
Bid Date: Aug 27 2025
Dahlonega, GA
Bid Date: Oct 15 2025
Dahlonega, GA
Bid Date: Oct 15 2025
Dahlonega, GA
Bid Date: Dec 11 2025
Dahlonega, GA
--
Dahlonega, GA
Bid Date: Sep 15 2025
Dahlonega, GA
Bid Date: Sep 15 2025
Dahlonega, GA
Bid Date: Jul 10 2025
Dahlonega, GA
Bid Date: Jul 18 2025
Dahlonega, GA
Bid Date: Jul 18 2025
Dahlonega, GA
Bid Date: Aug 05 2025
Dahlonega, GA
Bid Date: May 29 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
