BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2025 at 8:00 PM

Updated September 11, 2025

This is a service / maintenance or supply contract in Winnipeg, Manitoba. Contact the soliciting agency for additional information.

Reference Number 0000300786 Scope of Work: Project includes the design, construction, and delivery of new Ready-To-Move classrooms to be installed on Manitoba Public Schools property. These classrooms are intended to be in place for a minimum of 3 years up to 10 years. It is imperative that classrooms are delivered to site within 4 months or less upon finalization of order. Building Description (Code Analysis): Interior Classroom Area: Approximately 800 sq ft (75 sq. m) each classroom with dimensions approximately 25' x 32' (7.62 m x 9.75 m). Major Occupancy: Group A Division 2 Building Classification: 3.2.2.28 1 Storey, facing 1 street Permitted Area = 400 sq meters Combustible construction permitted, non-combustible cladding required Exterior walls to have 45 min FRR Sprinkler System is not required. Roof Assemblies & Load Bearing Elements = Fire rating not required No Mezzanine & No Basement Floor assemblies over crawlspace need not be rated. Occupant Load: 25 students + 2 staff = 27 per classroom Exits: Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Educational

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
43
Bidding Soon
533
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2025

October 13, 2025

Project location map

To Be Determined, Winnipeg, MB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.