Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 19, 2025 at 8:00 PM
Updated September 20, 2025
Renovation of a data center facility in Winnipeg, Manitoba. Completed plans call for the renovation of a data center facility.
Reference Number 0000300917 Pricing Lump sum Question Acceptance Deadline 2025/08/27 01:00:00 PM CDT MBLL requires a Bidder to supply and deliver a UPS unit as described in the RFQ, in a timely, cost effective and sustainable manner. MBLL requires a Bidder to supply and deliver unit as described below in a timely, cost effective and sustainable manner. 1 Liebert APM2 600V In, 600 V Out 200kVa/kW UPS (Uninterrupted Power Supply) 1 Liebert Bypass Cabinet 1 EnerSys Pure Lead Battery Cabinet with 40 EnerSys XE1040-FR Batteries. Factory Authorized startup is required. Installation will be by others. Proposed units do not have to be Liebert brand; however, it must match their exact specifications. If an equivalent product is quoted, a completed Request for Approval of Alternate Equivalent (Appendix A) must be submitted with the quotation to be considered. MBLL's decision in all matters relating to the review and approval of an equivalent product will be final and not subject to appeal. Proposed equivalent model(s) must include specification sheets with their offer. See attached single line and line up drawings. SPECIFICATIONS UPS IP 20 rated enclosure with front only service access, casters and leveling feet. Front to Top Airflow- includes top fan exhaust. Top Cable Entry, Wiring Cabinet or Attached Ancillary required for bottom entry Two Monitoring Card Slots: IS-UNITY-DP / IS-RELAY IS-UNITY-DP: network card factory installed for SNMP, Modbus, BACnet interfacing to Building Management Systems and environmental sensor support. IS-RELAY: Relay Contact Interface Kit; P/N: IS-RELAY; Provides relay contact signals for "On Battery", "Low Battery", "On Bypass", "UPS Fault", "Summary Alarm". Transformer-Free Modular & Scalable Architecture - Efficiency up to 97.5% in double conversion mode UL and cUL Listed to UL Standard 1778 5th Edition 65kAIC Rating - Provides interrupting rating and labeling of 65kA Unity Power Factor Rating - Delivers more usable power per kVA Load Power Factor Support - Supports loads 0.5 leading and lagging to unity without de-rating Energy Optimization Mode (Eco-Mode) up to 99% efficiency Dynamic online mode up to 98.8% efficiency Flexible energy storage (battery) technologies High-capacity rated battery charger MBLL reserves the right to amend or cancel this competition at any time and is under no obligation to accept or act upon the lowest or any submission. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Post-Bid
Data Centers
$400,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2025
October 6, 2025
484 McPhillips St, Winnipeg, MB
Related To This Project
Winnipeg, MB
--
Winnipeg, MB
--
Winnipeg, MB
--
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Sep 17 2025
Winnipeg, MB
Bid Date: Sep 18 2025
Winnipeg, MB
Bid Date: Sep 23 2025
Winnipeg, MB
Bid Date: Sep 02 2025
Winnipeg, MB
Bid Date: Sep 11 2025
Winnipeg, MB
Bid Date: Sep 10 2025
Winnipeg, MB
Bid Date: Jul 28 2020
Winnipeg, MB
Bid Date: May 06 2021
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
