BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2025 at 7:00 PM

Updated December 6, 2025

Renovation of a municipal facility in Olympia, Washington. Completed plans call for the renovation of a municipal facility.

Minority-owned business 10% Women-owned business 6% Veteran-owned business 5% Small/mini/micro business 5% This request seeks design and construction administration work for developing the Campus Energy System Replacement, identified as the preferred alternative to replace the Capitol Campuss heating system. The existing steam heat system for the Capitol Campus, over 100 years old and serving most campus buildings, is neither reliable, safe, nor efficient. Transitioning to a new system aligns with Washington State's move towards a zero-carbon platform and directly contributes to meeting the Clean Buildings Performance Standards legislation. This Request for Qualifications is for the purpose of selecting a Consultant for Design and Engineering for the Campus Energy System Replacement located at Olympia, WA. The following general scope of work describes the anticipated extent of design services to be provided by the consultant team. This description is not necessarily all-inclusive, and the consultant team should consider any tasks or services deemed necessary to complete the project satisfactorily. Consultant teams are encouraged to bring any expertise gained from other projects, creative ideas tested elsewhere, and best practices applicable to this project. 1. Design Services: Prepare comprehensive design and engineering documents for the Campus Energy System Replacement. a. The documentation should include detailed construction plans, demolition plans, and methodologies to be employed during the process. b. Design of a centralized equipment location on West campus based on options outlined in the Decarbonization Report. c. Design of infrastructure and equipment location in preexisting spaces in East Campus as outlined in the Decarbonization Report. d. Plan should evaluate and recommend phasing approach to permitting, site preparation, demolition, and construction. e. Ensure that all work complies with all relevant local, state, and federal regulations including House Bill 1390. DES - Campus Energy System Replacement - Department of Enterprise Services. QA date :- 09/10/2025

Award

Municipal

$8,300,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

33

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
103
Bidding Soon
1,521
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2025

November 21, 2025

Project location map

To Be Determined, Olympia, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.