BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 7, 2025 at 8:00 PM

Updated October 8, 2025

Demolition, site work and new construction of an educational facility in Citrus Heights, California. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; and for site work for a educational facility.

The San Juan Unified School District ("District") is issuing a Request for Proposals ("RFP") from Lease-Leaseback ("LLB") entities prequalified to provide to the District construction services for the construction of the San Juan High School Science Modernization (Bid Package #26-200) at San Juan High School. Prequalification is required for this project. September 02, 2025 by 10:00 AM - Deadline to submit questions The Scope of Work for the Project consists of the following: Preconstruction services, including without limitation providing review of and input on design documents, value engineering, estimating, preliminary scheduling, and bidding to develop the Total Base Rent (TBR). The project consists of the modernization of existing building 'B' and includes 6 new science classroom, 2 standard classrooms, Support Services rooms and new restrooms(14,000 SF), abatement and partial demolition of existing building, and site upgrades including perimeter fencing accessibility improvements as required by the Division of the State Architect ("DSA"). The project also includes an interim housing component to relocate the existing 4 science classrooms in building B to other classrooms on campus and ensure utilities are operational for start of the Fall semester 2026. The existing science classrooms will move to B13 (Chemistry), E4 (Physics), D11 (Physics/ Environmental Science), and D13 (Biology). There will be a light modernization (refresh) of existing classrooms in other buildings that will include potential casework removal, flooring removal, new flooring, and new interior paint. There is potential for hazmat removal related to this scope of work. This light modernization (refresh) scope will not be part of the DSA submittal project. The extent of the buildings and exact classrooms to be part of the project are to be determined during the pre-construction phase. The project will include painting of exterior walls, doors, and gutters of all buildings excluding culinary arts building. Doors to get new signage and building names will need to be repainted. It is assumed all existing exterior wall paint contains lead. Paint samples will be taken to determine the type of paint to be used. Estimated Contract Term: 20 Months

Award

Educational

$15,000,000.00

Public - County

Demolition, New Construction, Site Work

13

12

3

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
475
Active Projects
245
Bidding Soon
2,285
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2025

January 5, 2026

Project location map

7551 Greenback Ln, Citrus Heights, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.