Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 27, 2025 at 8:00 PM
Updated October 28, 2025
Renovation of a municipal facility in Warsaw, Missouri. Completed plans call for the renovation of a 2,300-square-foot municipal facility.
This project consists of demolition down to the wood substrate, clean up and disposal of all flashing, underlayment, and shingles, and installation of Pro Panel II metal or approved equivalent roof system at approximately 2300 sq. ft. including all roof penetrations, and limits of flashing and vent, trim and drip edge etc. for well house buildings #1, #2, #3,& #4. Contractor shall submit manufacturer Specifications on all products used in project for Gauge, Color, Installation instructions, accessories, warranties, fasteners for approval prior to start of project. 2. Site mobilization and demobilization.3. Contractor shall field verify all measurements. 4. The Contractor shall not remove any more roof during the day than they can completely replace with new roofing materials including night seal-off and flashing of perimeter and accessories. 5. Night seals or cut offs used shall flash all of roof system down to deck to prevent water penetration into the new roof. 6. Awarded contractor shall provide a detail showing proposed night seal or cut off flashing to be used at the end of each day's work for approval by owner. 7. Contractor shall examine substrates, areas, and conditions for compliance with requirements for installation tolerances and other conditions affecting performance of work. o Examine roof sheathing to verify that sheathing joints are supported by framing and blocking, or metal clips and that installation is within manufacturer's flatness tolerances. o Verify that substrate is sound, dry, smooth, and clean. Sloped for drainage and completely anchored; and that provision has been made for flashings and penetrations through asphalt shingles. o Contractor shall provide an allowance of 150 sq ft per building to replace damaged substrate if found, this will be a total of 600 sq ft for all four buildings in this project. 8. Contractor shall daily clean work area not only on the roof but ground below as well, there shall be a magnetic sweep performed daily as well as visual to clean up any material on the ground. 9. Contractor shall protect guttering system and facia during entire project, keep clean, and ensure all gutters and downspouts are free and clear of debris at all times. 10. Metal roof system shall consist of new Pro Panel II type. o 26-gauge minimum o 9" inch on center rib galvanized treated o 30-year minimum chalk and fade warranty painted metal or approved equivalent o Color designated by owner 11. Underlayment shall be a self-adhesive such as GAF Weather Watch or approved equivalent installed in accordance with manufacturer's written instructions. 12. All trim shall be minimum 29 gauge and color matching to metal roof panels. 13. Ridge caps shall be color matching 29 gauge minimum and have foam closure strips installed in accordance with manufacturers written instructions. 14. All metal and trim shall be fastened with color matching EDPM rubber washer screws in accordance with manufacturer's instructions. 15. Contractor shall take all necessary precautions to protect and preserve the cleanliness and integrity of the gutter system and shall clean and insure proper operation of gutter system at completion of job. 16. Pipe penetrations shall have correct sized pipe boot EPDM flashing installed for each pipe. 17. Flashing shall be constructed using Sheet Metal Coil-coated G90 galvanized steel or approved equivalent. 18. Contractor shall install GAF Weather Watch Self Adhesive Underlayment or approved equivalent on roof deck perpendicular to roof slope in parallel course. Lap sides a minimum of 2" inches over underlying course. Lap ends a minimum of 4" inches and stagger end laps between succeeding courses at least 72" inches, fasten seams with roofing nails. 23. Contractor shall install flashings as follows. o Apron Flashings: Extend lower flange over and beyond each side of downslope of metal roofing and up the vertical surface. o Step Flashings: Install with a headlap of 2" inches and extend over the underlying metal roofing and up the vertical surface. Fasten to roof deck only. o Cricket or Backer Flashings: Install against the roof-penetrating element extending concealed flange beneath upslope of metal roofing and beyond each side. o Open Valley Flashings: Install centrally in valleys, lapping ends at least 8" inches in direction to shed water. Fasten upper end of each length to roof deck beneath overlap. o Secure hemmed flange edges into metal cleats spaced 12" inches apart and fastened to roof deck. o Rake Drip Edges: Install rake drip edge flashings over underlayment and fasten to roof deck. o Eave Drip Edges: Install eave drip edge flashings below underlayment and fasten to roof sheathing. Pipe Flashings: Form flashing around pipe penetrations and metal roofing. Fasten and seal to metal roofing as recommended by manufacturer. Contractor shall reinstall skylights and neatly notch around raised ridges of the pro panel II metal and fasten with EPDM rubber washer color matching screws and caulk the entire perimeter of the skylight flashing with color matching silicone caulk. Where corner trim comes in contact with Unistrut on sides of building the trim shall be trimmed and fastened around the Unistrut and caulked with color matching silicone, the trim ends shall be formed and closed at the end of the trim runs. Question Deadline 09/25/2025: Every request for interpretation shall be made in writing and submitted with all supporting documents not less than seven (7) calendar days before opening of bids.
Award
Municipal
$24,995.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 2, 2025
November 3, 2025
28232 hatchery Ave, Warsaw, MO
Related To This Project
Warsaw, MO
Bid Date: Dec 15 2025
Warsaw, MO
Bid Date: Dec 01 2025
Warsaw, MO
Bid Date: Dec 22 2025
Warsaw, MO
Bid Date: Feb 09 2026
Warsaw, MO
Bid Date: Feb 17 2026
Warsaw, MO
Bid Date: Feb 16 2026
Warsaw, MO
Bid Date: Mar 12 2026
Warsaw, MO
Bid Date: Sep 05 2025
Warsaw, MO
Bid Date: Aug 22 2025
Warsaw, MO
Bid Date: Sep 17 2025
Warsaw, MO
Bid Date: May 19 2025
Warsaw, MO
Bid Date: Mar 19 2025
Warsaw, MO
Bid Date: Mar 17 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
