Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 19, 2025 at 8:00 PM
Updated September 20, 2025
Site work for a civil project in Saint David, Arizona. Completed plans call for site work for a water / sewer project.
The project will consist of two phases of work. Phase 1 is comprised of replacing the distribution system, and Phase 2 is comprised of installing a new booster and providing additional storage. The water system will be required to provide service to the customers throughout both construction phases. It is expected that a switchover will occur within a single day, once both phases of construction are approved. Phase 1 construction activities will include replacing all distribution lines with 3,688 lineal feet of 4-inch C-900 PVC pipe, 109 lineal feet of 4-inch ductile iron pipe, 20 each 4-inch valves, 6 each 2-inch post fire hydrants, 1 each blow off assembly, and appurtenant bends and service connections. Phase 2 will include connecting two 10,000 gallon plastic storage tanks to the existing welded steel tank, adding a new 3 HP booster pump with pressure switch & re-locating the 3 each bladder tanks on a concrete pad, installing a new electric rack, and connecting the electric to the existing electric sub-panel. This project is federally funded and will require Davis-Bacon wages, certified payroll, and American Iron & Steel. Individuals with special accessibility needs may contact Russell and Beth Chambers at sweetspringsmhp@gmail.com or 541-231-9981 at least seventy-two (72) hours prior to the meeting. Failure of the proposer to complete all of the bid documents may result in rejection of the Bid. Deadline to Submit Questions 9/12/2025 @ 3:00 PM For questions about the bidding process, please contact William D. Osborne, AICP, SEAGO Community Development Program Manager at wosborne@seago.org or 520-559-8546. For questions about the plans or specs, please contact Greg Carlson, C.E. at gregc@gceng.biz or 520-624-0070.
Bid Results
Water / Sewer
$740,253.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 16, 2025
November 17, 2025
323 S Lee St, Saint David, AZ
Related To This Project
Saint David, AZ
Bid Date: Dec 11 2025
Saint David, AZ
Bid Date: Apr 18 2025
Saint David, AZ
Bid Date: Apr 18 2025
Scottsdale, AZ
Bid Date: Sep 26 2025
Tucson, AZ
Bid Date: Aug 25 2025
Phoenix, AZ
Bid Date: Sep 10 2025
Bullhead City, AZ
Bid Date: Feb 18 2026
Sierra Vista, AZ
Bid Date: Sep 29 2025
Casa Grande, AZ
Bid Date: Sep 04 2025
Globe, AZ
Bid Date: Sep 19 2025
Globe, AZ
Bid Date: Sep 19 2025
Window Rock, AZ
Bid Date: Sep 04 2025
Bullhead City, AZ
Bid Date: Sep 17 2025
Bullhead City, AZ
Bid Date: Sep 17 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
