BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2025 at 7:00 PM

Updated December 2, 2025

Site work, paving and renovation of a mixed-use development in Taft, California. Completed plans call for the renovation of a 27,877-square-foot, one-story above grade educational facility; for site work for a educational facility; and for paving for a educational facility.

**As of December 01, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** PROJECT DESCRIPTION: General Alterations at Mullen Gymnasium PROJECT SCHCEDULE: Construction will start on March 2, 2026 and must be complete by July 31, 2026. A Phasing Plan will be provided with the Bid Documents. This is a prevailing wage project. A Payment Bond for contracts over $25,000 and a Performance Bond for all contracts will be required prior to commencement of work. These bonds shall be in the amounts and form called for in the Contract Documents. RETAINAGE: Owner will retain 5% of the amount of all progress payments. If any bidder is in doubt as to the true meaning of any part of the Contract Documents, or finds discrepancies in or omissions from the drawings and specifications, a written request for an interpretation (RFI) or correction shall be submitted to the Owners Project Manager at josem@vcsi.com 7 business days before the bid deadline

Post-Bid

Educational

$2,950,000.00

Public - City

Paving, Renovation, Site Work

99

20

262

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
92
Bidding Soon
1,435
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2025

March 2, 2026

Project location map

701 Wildcat Way, Taft, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.