Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 18, 2025 at 8:00 PM
Updated September 24, 2025
Site work, paving and new construction of a mixed-use development in Taft, California. Completed plans call for the construction of a educational facility; for site work for a educational facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
All Labor, Materials & Equipment as Required & Necessary for All Site Work Improvements, to Include but Not Necessarily Limited to, Demolition, Grading, Drainage, Ac Paving, Concrete Masonry Retaining Walls & Footings, Curbs, Gutters, Walkways, Fencing, Underground Utilities Including, Electrical, Sewer, Septic Tanks, Storm Drainage, Fire Alarm. Modular Contractor Will Provide and Install Utilities Under Their Concrete Slab, Contractor Shall Coordinate and Provide Point of Connections and Final Hookups of All Utilities as Indicated Per Plans and Specifications, Contractor Shall Provide Finish Pad With Certified Grades and Provide Corner Stakes for Modular Buildings Pm-1 and Pm-2, Concrete Foundations and Slab Will Be by Modular Contractor.contractor Shall Install Owner Provided 30'x40' Shade Structure (Pc 04-121917) and Shall Be Responsible for All Labor, Materials and Equipment to Install Foundation, Concrete, Rebar, Anchor Bolts and Final Erection of Shade Structure and All Other Work as Required and or Indicated on These Plans for (2) Permanent Modular Pre-k Buildings & All Utility Hook-ups to Ensure a Complete & Functional Project Ready for Occupancy. This project is anticipated to start on approximately November 3, 2025 and is anticipated to have a duration of 365 calendar days for completion. A Payment Bond for contracts over $25,000 and a Performance Bond for all contracts will be required prior to commencement of work. These bonds shall be in the amounts and form called for in the Contract Documents.
Award
Educational
$1,189,721.00
Public - City
New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 11, 2025
November 3, 2025
623 Rose Ave, Taft, CA
Related To This Project
Taft, CA
Bid Date: Sep 18 2025
Taft, CA
Bid Date: Oct 02 2025
Taft, CA
Bid Date: Sep 12 2025
Taft, CA
Bid Date: Oct 06 2025
Taft, CA
Bid Date: Oct 24 2025
Taft, CA
Bid Date: Nov 20 2025
Taft, CA
Bid Date: Jan 15 2026
Taft, CA
Bid Date: Jan 15 2026
Taft, CA
Bid Date: Jul 16 2025
Taft, CA
Bid Date: Jun 24 2025
Taft, CA
Bid Date: Jul 17 2025
Taft, CA
Bid Date: May 28 2025
Taft, CA
Bid Date: Apr 18 2025
Taft, CA
Bid Date: Mar 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
