This is a service / maintenance or supply contract in Sacramento, California. Contact the soliciting agency for additional information.

The California High-Speed Rail Authority (Authority) anticipates releasing a new Invitation for Bids (IFB) to purchase commoditized ballast (crushed igneous rock) materials necessary to complete the First Construction Segment of its high-speed rail track. This draft IFB will be considered for approval and official release by the Authority's Board of Directors at its meeting scheduled for August 28, 2025, and is subject to change and approval by the Authority's Board of Directors. Posting of this draft IFB does not constitute acceptance of bids. The draft IFB or its approval, if granted by the Board of Directors, does not constitute a release of the final IFB. Questions regarding this procurement may be submitted only upon final approval of IFB by the Board of Directors and release on the California State Contract Register. Each materials contract will be issued through multiple Notices to Proceed (NTPs) as described below. The estimated cumulative value for all materials contracts (steel OCS poles, rail, concrete ties, ballast, OCS system components, and fiber optic cable) is not-to-exceed $507.1 million for NTP 1. - NTP 1: The initial authorization to be issued for the manufacture and supply of Materials for use in construction on the 119-mile First Construction Section. - NTP 2: To be issued at the Authority's option for the manufacture and supply of Materials for use in construction on the northern extension (Merced to Madera). - NTP 3: To be issued at the Authority's option for the manufacture and supply of Materials for use in construction on the southern extension (Poplar Avenue in the County of Kern to Bakersfield). The scope of work for this specific procurement and resulting contract is to provide Ballast materials, composed of crushed igneous rock, for use in construction on the 119-mile First Construction Section, with an estimated lead time of two to three weeks for NTP 1. General requirements for each material are provided in the IFB and draft agreement. The Contractor shall not perform any Work unless the Authority, in its sole discretion, issues a Notice to Proceed (NTP) and Purchase Order for such work. The actual amount of Work requested by the Authority is subject to the availability of funding. In addition, all materials must be newly manufactured goods and conform to the technical specifications provided by the Authority. All materials supplied must be Buy America and Build America, Buy America Act (BABA) compliant, in accordance with 49 U.S.C. 22905 and 2 C.F.R. part 184. Information regarding the Pre-Bid Conference and Small Business Workshop is available on the Authority's website. The anticipated schedule for this new procurement is as follows: - IFB Release: Q4 2025 - Virtual Pre-Bid Conference: TBD - Bid Due/Opening Date: TBD - Notice of Proposed Award: TBD - Anticipated Contract Execution and Notice to Proceed: TBD Questions regarding this procurement should be submitted to Kathryn Talattad at materialpurchase@hsr.ca.gov or (916) 324-1541.

Sub-Bidding

Transportation Terminals

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
441
Active Projects
183
Bidding Soon
2,634
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2026

March 23, 2026

Project location map

Multiple Locations, Sacramento, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.