Published October 1, 2025 at 8:00 PM

Updated October 2, 2025

Site work for a water / sewer project in Clinton, New Jersey. Completed plans call for site work for a water / sewer project.

The work will include but is not limited to the installation of approximately 520 linear feet of twelve-inch (12") and approximately 80 linear feet of six-inch (6") DIP potable water mains underground, and bridge attachment of approximately 230 linear feet of twelve-inch (12") DIP potable water main. The project sponsor has identified that the SED utilization goal for this project is: 10% The extent of the scope of work is on Cokesbury Road (County Route 639) between Corporate Drive and Prostak Lane. The bridge attachment scope of work requires night work on Interstate 78. The work also includes but is not limited to installation of temporary water main bypass, service connections, valves, fire hydrants, and related appurtenances. The contractor is responsible for providing all labor, supervision, trade skills, materials, and equipment required for this project as described in the Construction Documents. The Contract will allow 180 calendar days for completion of the work from the notice to proceed. A certified check or cashier's check made payable to the order of the Town of Clinton, or a duly executed Bid Bond, in the amount of ten percent (10%) of each bid, but in no case in excess of $20,000.00 must be deposited by the Bidder together with a Surety Consent evidencing that They can obtain the required Performance Bond. All applicable surety bonds required in connection with the advertisement and award of building contracts or sub agreements must be written by a surety company listed on the Federal Treasury List (Department Circular 570 - Surety Companies Acceptable on Federal bonds), incorporated herein by reference. The successful Bidder will be required to deliver to the Owner an executed Performance Bond and Payment Bond of a responsible indemnity company authorized to do business in the State of New Jersey. This project is subject to both davis bacon wage rate requirements and new jersey prevailing wage rate requirements. The contractor shall utilize the higher of the two rates in each and Every category of work on the project. This project is expected to be funded in part by New jersey department of environmental protection (njdep) and new jersey environmentalInfrastructure trust (njeit). Neither the state of new jersey, the njeit nor any of their Departments, agencies or employees is, or will be, a party to this contract or subcontract. This contract or subcontract is subject to the provisions of n.J.A.C. 7:22-3,-4,-5,-9 and -10. All federal prevailing wage regulations as well as the federal labor standards provisions will Apply. Attention is called to the fact that the contractor must ensure that employees and Applicants for employment are not discriminated against because of their race, creed, color, Sex or national origin and to the greatest extent possible, opportunities for training and Employment shall be given to lower-income residents of the project area and that, when Possible, contracts shall be awarded to business concerns owned by area residents. Small, Minority and women's business enterprises are encouraged to submit bids. Bids for Proposals in excess of $100,000 must be accompanied by a written affirmative action plan. The successful bidder for the project shall Commit to the use of small business concerns owned and controlled by seds with a goal of Ten percent (10%) of the work value under the contract. All contractors, including sed Contractors, shall submit their own sed utilization plan to the njdep oeopca, with a copy To the owner, within thirty (30) days of the contract award. The town of clinton reserves the right to consider bids for sixty (60) days after their receipt. The right is reserved to waive any informalities, to accept bids which it deems most favorable to the interest of the town to make an award on each item separately or as a whole and to accept any bid or to reject any or all proposals in accordance with the specifications and the bid forms.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

23

17

3

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
880
Active Projects
282
Bidding Soon
7,223
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2025

October 30, 2025

Project location map

I-78, Clinton, NJ


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.