BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 24, 2025 at 8:00 PM

Updated October 25, 2025

Demolition and site work for a municipal facility in Albert Lea, Minnesota. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

The work involves demolition and removal of the structure All questions regarding the plans and specifications that potential bidders have prior to the bid opening shall be submitted in writing to the Building Official, Wayne Sorensen, wsorensen@ci.albertlea.mn.us, 507-377-4340 SCOPE OF THE CONTRACT A. Intent of Plans and Specifications: The intent of the Plans and Specifications is to prescribe a complete work or improvement which the Contractor undertakes to do in full compliance with the Plans, the Specifications, the Special Provisions, Proposals, and Contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, supplies, and incidentals which may be necessary to construct and complete the improvement in accordance with the Contract. B. Change in Quantities of Work: The Engineer is given the right to increase or decrease any or all of the items specified in the Plans, Proposal, and Contract including the elimination of any one or more such items. Such changes shall in no way invalidate the Contract, and unless otherwise specified, will be made at the Contract Unit Prices. If notice of any change affecting the general scope of the work or the provisions of the Contract documents (including, but not limited to, Contract Price or Contract Time) is required by the provisions of any bond to be given to a surety, the giving of any such notice will be the Contractors responsibility, and the amount of each applicable bond will be adjusted accordingly. C. Examination of Site: Bidders shall inform themselves of the conditions under which the work is to be performed concerning the site of the work, the structure of the ground, the obstacles which may be encountered, and all other relevant matters concerning the work to be performed and, if awarded the Contract, shall not be allowed any extra compensation by reason of other matter or things concerning which such bidder might have fully informed himself or herself prior to the bidding. The successful Contractor must employ, so far as possible, such methods and means in carrying out the work as will not cause any interruption or interference with any other Contractor Bid Result Scope #1 -Dulas Excavating Inc.-$245,000 Scope #2 -Dulas Excavating Inc.-$302,000 Scope #3 -Dulas Excavating Inc.-$374,000 Scope #4 -Dulas Excavating Inc.-595,000

Award

Municipal

$1,516,000.00

Public - City

Demolition, Site Work

3

5

2

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
2
Bidding Soon
359
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2025

November 1, 2025

Project location map

338 S Broadway Ave, Albert Lea, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.