Published September 23, 2025 at 8:00 PM

Updated September 24, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Champlin, Minnesota. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Cartway Bridge Replacement Project shall include the furnishing of all labor, materials, tools, and equipment necessary to complete the bridge replacement, watermain, storm sewer, street construction, and appurtenant work as shown on the Plans and specified herein. A temporary paved roadway will be utilized to re-open Cartway Rd to traffic in the winter of 2026 without concrete work. The temporary roadway can be hot mix, cold patch, or temporary concrete at the discretion of the Engineer depending on material availability. The Contractor shall be responsible for maintaining the paved roadway to the standards of the City at no additional cost. The temporary roadway will be removed prior to concrete work and final paving in the spring of 2026 at no additional cost. Minority: People of color and Indigenous people: 32% Women: 12% Question Deadline 09/08/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Direct questions about this Project to Laura Rescorla at 612-772-4633 and lrescorla@wsbeng.com. Questions received less than seven days prior to the date for opening of Bids may not be answered. The Contract is anticipated to be awarded by the Owner in August 2025 The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: 1,100 S Y Full Depth Reclamation 700 L F Remove and Replace Concrete Curb and Gutter 500 CY Excavation Common (P) 1,500 CY Select Granular Embankment (CV) 200 L F 14x14 Precast Concrete Box Culvert 350 TON Type SP 12.5 Wearing Course Mix (2,C) 250 LF 15"-18" RCP Storm Sewer 140 L F 12" Ductile Iron Watermain The City Council reserves the right to reject any and all Bids and to waive any Bids received without explanation. No Bid may be withdrawn for a period of 60 days. For all further requirements regarding Bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Award

Bridges / Tunnels

$1,701,552.00

Public - City

Demolition, New Construction, Paving, Site Work

36

16

2

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
122
Bidding Soon
1,551
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2025

October 15, 2025

Project location map

To Be Determined, Champlin, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.