Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 13, 2025 at 7:00 PM
Updated December 14, 2025
Site work and paving for a sidewalk / parking lot in Pilot Rock, Oregon. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Region 5 Eastern Oregon 2024-27 ADA Curb Ramps, Phase 2 Project Pendleton and Pendleton-John Day Highways Bryan E. Strasser, RE Jonathan Gelling, PM, Consultant, Consor North America ($ 500,000 - $ 1,000,000) Eastern Oregon 2024-2027 ADA Curb Ramps, Phase 2 Project on the Pendleton and Pendleton-John Day Highways (Rt. No. US30, Hwy028, OR37) in Pendleton. FAP No. SA00(830). ($ 2,000,000 - $ 5,000,000). Req. approx. 2,950 ft2 temp sign; 64 hr flag; 64 hr flag sta light; 2,356 ft2 bar rem; 546 ft PCD; 6 ea temp curb ramp; 110 ea inlet protect; 1 ea decomm underg tank; 1,348 ton contam soil disp; 670 gal contam groundw rem; 9 ea soil test; const surv work; 6,743 yd2 rem surf curb ramp; 9,652 ft pvmt sawcut; 1,500 ft vid insp; 732 ft pipe; 12 ft trench drain; 12 ea manhole; 46 ea inlet; 41 ea adj struct; 41 ea conn to exist struct; 12 ea manhole over exist sewer; 1,330 yd2 CPPR; 2,434 ton aggr base; 359 ton comm ACP; 5,482 ft conc curb; 97,253 ft2 conc struct; 1,787 ft2 trunc dome; 2 ea conc wheel stop; 62 ft pvmt marking paint; 2,418 ft2 pvmt bar; 2 ea crosswalk closure; 4,018 lb sign supp; 856 ft2 sign; rem electrical sys; refurb/reinstall exist illum sys; traff sig mod; 3 yd3 topsoil; 83 yd2 sod; 16 yd3 bark mulch; 31 yd3 rock mulch; 40 ft rem/rebuild fence; 26 ft metal handrail; 1 ea reconn water service. Email the Project Manager Listed at the End of Each Announcement for Project Specific Technical Questions Completion Time: October 31, 2026. Class of Work: Earthwork and Drainage, or B) Miscellaneous Highway Appurtenances. This project contains fuel escalation clause This Project Contains a 5% Dbe Goal. This Project Contains a 20% Indian Employment Preference Goal. Project Manager: Bryan Strasser, Email: Bryan.e.strasser@odot.oregon.gov The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. For Bids submitted by hand delivery, date stamp the Bid with the provided date stamping device and place into the ODOT Procurement Bid Box located in the 1st floor lobby at the following address: Oregon Department of Transportation 355 Capitol Street NE, Salem, Oregon 97301 Bids, Bid modifications, and Bid withdrawals will not be accepted at or after 9:00:00 a.m. on the day of Bid Closing To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT's Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project's special provisions, and the bid booklet. ORDOT - 001 - Eastern Oregon 2024-2027 ADA Curb Ramps, Phase 2 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Sidewalks / Parking Lot
$3,466,664.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 30, 2025
February 27, 2026
Pendleton-John Day Hwy, Pilot Rock, OR
Related To This Project
Pilot Rock, OR
Bid Date: Oct 30 2024
Pilot Rock, OR
Bid Date: Oct 09 2024
Pilot Rock, OR
Bid Date: Jan 07 2022
Irrigon, OR
Bid Date: Dec 11 2025
Corvallis, OR
Bid Date: Dec 11 2025
Roseburg, OR
Bid Date: Jan 15 2026
Dallas, OR
--
Medford, OR
--
Bay City, OR
--
Rickreall, OR
--
Winberry, OR
--
Mount Angel, OR
--
Gearhart, OR
--
Brothers, OR
Bid Date: Sep 04 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.