BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 2, 2025 at 8:00 PM

Updated October 4, 2025

Site work and paving for a mixed-use development in East Dundee, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The proposed work is officially known as the "VILLAGE OF EAST DUNDEE THIRD STREET AND WATER STREET IMPROVEMENTS". The work performed will include modifying Water and Third Street from two-way traffic to one-way traffic with all necessary restoration, in the Village of East Dundee, Illinois, as further described in the contract documents of the said work prepared by Christopher B. Burke Engineering, Ltd. (CBBEL). Est. Completion Date: Nov. 14, 2025

Award

Roads / Highways

$537,080.00

Public - City

Paving, Site Work

30

4

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
544
Active Projects
294
Bidding Soon
3,888
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2025

October 13, 2025

Project location map

Multiple Locations, East Dundee, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.