Site work and paving for a civil project in Tulalip, Washington. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Tulalip Tribes Project No.: 2025-001 Tulalip Bay Water System Improvements (Schedules A, B, and C): Schedule A includes construction of approximately 7,700 linear feet of restrained 6-inch-diameter PVC C900 pipe, 40 linear feet of restrained 8-inch-diameter PVC C900 pipe and associated restrained fittings, 124 water service meter assemblies combination of near and far sides, thirty-four 6-inch gate valves, three 8-inch gate valves, nine fire hydrant assemblies, four 2-inch combined air/vac valve assemblies, and five 2-inch blowoff assemblies. The Work also includes four connections to the existing 6-, and 8-inch water system, property restoration, temporary erosion and sediment control, and roadway/trench restoration, located along Hermosa Beach Road and Fryberg Estates. Schedule B includes construction of approximately 1,140 linear feet of restrained 6-inch-diameter PVC C900 pipe and associated restrained fittings, 17 water service meter assemblies combination of near and far sides, nine 6-inch gate valves, one 2-inch combined air/vac valve assembly, and one 2-inch blowoff assembly. The Work also includes three connections to the existing 6-inch water system, property restoration, temporary erosion and sediment control, and roadway/trench restoration, located along Mission Beach Road and Mission Beach Lane. Schedule C includes construction of approximately 1,300 linear feet of restrained 12-inch-diameter PVC C900 pipe and associated restrained fittings, five near side water service meter assemblies, one 12-inch gate valve, two fire hydrant assembly, two 12-inch tapping sleeve and valve assemblies. The Work also includes property restoration, temporary erosion and sediment control, and roadway/trench restoration, located along 88th Street NE. The project is located on the Tulalip Indian Reservation. Native American Preference related to contracting, subcontracting, and suppliers in the project is required and must meet The Tulalip Code, Chapter 9.05. Plans, specifications, addenda, bidders list, and plan holders list for this project are available Free of-charge access to project bid documents (plans, specifications, addenda, and Bidders List) is provided to Prime Bidders, Subcontractors, and Vendors by online. This online plan room provides Bidders with fully usable online documents with the ability to: obtain, view, print, order full/partial plan sets from numerous reprographic sources, and a free online digitizer/take-off tool.

Post-Bid

Water / Sewer

$400,000.00

Public - Federal

Paving, Site Work

55

6

5

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
287
Active Projects
138
Bidding Soon
1,865
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2025

October 17, 2025

Project location map

Multiple Locations, Tulalip, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.