Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 8, 2025 at 8:00 PM

Updated September 9, 2025

This is a service / maintenance or supply contract in Sandy, Utah. Contact the soliciting agency for additional information.

The project includes removal of the existing Power Generator and Enclousre, disposal, preparation of the site for the new geneartor, providing and installing a 150kW generator including day tank, sound attenuating enclosure and appurtenances including transfer switches in the administration building and maintenance building for a complete and operable backup power system. The Bidder shall provide a 5% bond Bid, Performance and Payment Bonds and other instruments which protect the OWNER against loss Each Bid shall be accompanied by a certified or cashiers check or approved Bid Bond in the amount stated in the Notice Inviting Bids Notice to Proceed is planned for September 19, 2025. Work shall be completed by March 20, 2026. that as liquidated damages for delay (but not as a penalty) the CONTRACTOR shall pay the OWNER $500.00 The OWNER reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards to the lowest responsive, responsible bidder as the OWNER in its sole discretion shall determine may best serve the interest of the OWNER.

Post-Bid

Power Plant

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
65
Bidding Soon
1,208
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2025

September 19, 2025

Project location map

Multiple Locations, Sandy, UT


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed