BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2025 at 7:00 PM

Updated December 2, 2025

Site work for a water / sewer project in Morris, Illinois. Completed plans call for site work for a water / sewer project.

The project is described as follows: work of the project includes, but is not limited to, drilling and testing of two (2) new wells. A certified check or bank draft, payable to the order of city of morris negotiable u.S. Government bonds (at par value) or a satisfactory bid bond executed by the bidder and an acceptable surety in an amount equal to five percent (5%) of the total bid shall be submitted with each bid. The successful bidder shall provide at least 50% of all labor required for the completion of this project The work to be performed under this contract is subject to the requirements of section 3 24 cfr part 75 The city of Morris reserves the right to reject any or all bids or to waive any informalities in the bidding. Question Deadline 10/01/2025 No oral interpretation will be made to any Bidder as to the meaning of the Contract Documents or any part thereof. Every request for such an interpretation shall be made in writing to the Local Public Agency. Any inquiry received seven or more days prior to the date fixed for opening the Bids will be given consideration, will be on file in the office of the Local Public Agency and the office of the Engineer at least five days before Bids are opened. MBE (18.4%), WBE (6.9%) Work ofthe Project includes, but is not limited to, drilling and testing of (2) two new wells (Well No. 8 and Well No. 9). The project shall include the price to drill both wells. However, ifthe first well proves to be unsuitable, the Owner reserves the right to cancel the second. Perform Work ofthe Contract in accordance with the General Conditions and Special Conditions. Time Restrictions for Performing Work: Work shall be fully substantially complete by 6/5/2026 and ready for final payment 7/17/2026.

Award

Water / Sewer

$3,776,390.00

Public - City

Site Work

5

12

4

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
449
Active Projects
239
Bidding Soon
3,333
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2025

November 5, 2025

Project location map

To Be Determined, Morris, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.